80 likes | 198 Views
KMA report. 31 October – 2 September 2011 Young-Youn Park Numerical Model Development Division, Korea Meteorological Administration. KMA global ensemble: Changes. TIGGE data. TIGGE data Old EPS data: 16 Jan 2008 ~ 30 Nov 2010 No data since 1 Dec 2010
E N D
KMA report 31 October – 2 September 2011 Young-Youn Park Numerical Model Development Division, Korea Meteorological Administration
TIGGE data • TIGGE data • Old EPS data: 16 Jan 2008 ~ 30 Nov2010 • No data since 1 Dec 2010 • because of network problem(too slow to ftp the new ensemble data ~ 64GB/day) • Tried two way: • To enhance N/W speed to ECMWF recently succeed (80min/32GB) under test • To send data to NCAR using LDM difficulty in setting LDM • Changes in TIGGE data • Resolution: (Operation 0.5625deg, TIGGE 1.25 deg) (0.5625, 0.375 deg) • Size: old 10GB/day new 64GB/day(later 84GB/day) • Parameter • 8 P levels * 5 par + gph at 50 hPa(OK) 4 pars (no q) • 1 pt level (320K) * 1 par (pv) (X) OK • 2 pv level * 3 parameter (X) pt (no u, v) • Single level * 28 parameter (6 parameters)19 pars
Other data • Cyclone data: ftp://cxml:cxml@210.107.255.35 • Not working after 30 Dec 2010 • Security issue with IT team • Will resume later … • Model description(metadata): ready to update • KMA’s verification statistics report(to LC on EPS verification): • Deterministic score: 200901- (NH), 201103-(TR, SH) • CRPS: under checking if KMA use the same method as instructed • Reliability table parameters: 200901- (NH), 201103-(TR, SH), T850, Z500, PMSL only
Trim obstore Varobs obstore Trimmed obstore OPS background OPS(24M) Previous cycle (-12 hours) Global 4DVar N512L70(25km) varobs ETKF background ETKF analysis IC Perturbations OPS background ETKF background UM Forecast N320L70M24(40km) Next cycle (+12 hours) KMA EPS Flow chart
Summer 2009 (.5.23-6.25) : Z500 OP vs MOGREPS(40km, 90km) NH RMSE MO(40km50L) SPREAD MO(90km38L) OPER SH
RMSE MO(40km50L) SPREAD MO(90km38L) OPER Summer 2009 (.5.23-6.25) : T850, MSLP OP vs MOGREPS(40km, 90km) T850 MSLP