1 / 10

Datamigreringsstrategi Engrosmodellen

Datamigreringsstrategi Engrosmodellen. Et overblik over metode og proces Vers. 1.0 November 2013. Migreringsstrategi. Sikre at nuværende funktionalitet i Datahub forbliver uændret frem til 01.10.2014 Ingen ændringer til forretningsprocesser og beskeder frem til 01.10.2014

ailsa
Download Presentation

Datamigreringsstrategi Engrosmodellen

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. DatamigreringsstrategiEngrosmodellen Et overblik over metode og proces Vers. 1.0 November 2013

  2. Migreringsstrategi • Sikre at nuværende funktionalitet i Datahub forbliver uændret frem til 01.10.2014 • Ingen ændringer til forretningsprocesser og beskeder frem til 01.10.2014 • Ingen ændringer i roller og ejerskab før 01.10.2014 • Support af EDIFACT indtil 01.10.2014 • Længst mulig data migreringsperiode for netvirksomheder i separat setup • Kortest mulig cut-over periode, med et minimum af system nedetid • En samlet cut-over plan med beskrivelser af hvem gør hvad hvornår • Hurtig og værdifuld feedback til netvirksomhed fra migreringsprocesser • Oprettelse af data team til håndtering af migreringsplan, fejlhåndtering og teknisk hjælp • Længst mulig data migreringsperiode for elleverandøreri datahub drift • Dedikeret projekt for sikring af, at in-flight processer migreres korrekt i cut-over fasen • Plan for minimering af antal processer frem i tid op til cut-over

  3. Datahub engrosdata, der skal migreres • Blå = nye data strømme • timeopløste tariffer og afgifter • gebyrer & abonnementer Abonnementer, tariffer og gebyrer Abonnementer og gebyrer Tariffer og afgifter 1-1 kunde relation Stamdata Tariffer Netvirksomhed Elleverandør Kunde eller virksomhed Afgifter

  4. Data kategorier der skal migreres 4 kategorier: • Prisinformationer - Prisliste • Tilknytningaftariffer, abonnementerprmålepunkt • Stamdataindikator for kunder med elvarme • Andre stamdata • Elleverandørstamdata • Nye målepunktsstamdata De første 3 kategorierskalværetilstedefor at elleverandørenkanfakturerekunderne

  5. Data og ansvar Pre-migrering Post-migrering Cut-over 1) Hvis data ikkefindes, skalelleverandørenrequeste data via BRS-005 – (branchekode, mm.)

  6. Data migreringsmængder Datamængderne i figuren er antal records- hver record indeholder flere felter

  7. Successiv data migrering Initiel 2 upload n upload Final 3 upload NV Fuld dataset Fuld dataset Fuld dataset Fuld dataset Fuld dataset 01. okt 2014 StartMigrering Delta DQ reporting DQ reporting DQ reporting DQ reporting Efter final delta bliver data fixeret til system go-live Datahub production DH

  8. Migreringsdata fra netvirksomhed til Datahub Grid operator Timestamp # records CRC value Filename Filesize … Scheduling/Verification DH data team File metadata Staging Staging delta FTP File verification Staging loader Data to messageconverter Delta loader Visual spot check Failure Failure Message Layer - CIM ODS Failure Failure CCR IS Change Success Failure / Rejectedmeteringpoints Datahub Production Migreringplan for data elementer nummer 2,3,4 og 5 Gældende fra 01.04.2014 og frem til 30.09.2014

  9. Fremsendelse af migreringsdata – trin for trin • Energinet.dk sikrerogpublicerermigreringsplandækkendealleaktører • Aktørenskaberkompletmigreringsfilog sender den til energinet.dk via FTP • FTP-serveren modtager migreringsfil fra aktøren • Filen kontrolleres for åbenlyse fejl og metadata bliver registreret • Filenimporterestilmigreringsdatabasen • Energinet.dk udfører en visuelstikprøvekontrolførselvemigreringen starter • Systemetberegnerdelta mellemmigrerede data ogaktuelleproduktionsdata • SystemetgenerererRSM beskederudfra de beregnede delta værdier • RSM beskederbehandlesved at udføre de tilsvarendeBRS’er • Systemet undertrykker enhver udgående besked genereret af de berørte BRS’er • Beskedsystemetrapporterereventuellefejlframigreringsprocessentilaktøren • Eventueltafvistemålepunktersendestilbagetilaktøren

  10. Migreringsdata fra Datahub til elleverandør Datahub Produktion BRS-005 BRS-034 BRS-038 Elleverandør Elleverandør Elleverandør Elleverandør Elleverandør Elleverandør B2B (normal operation) ODS FTP Data Extraction Distribute DH data team Tarif/Abonnementlinks Elvarmeindikator Kontaktdata Elleverandører udvalgt af Energinet.dk Migreringplan for data elementer nummer 2,3,4 og 5 Gældende fra 01.10.2014 og frem til 31.10.2014

More Related