1 / 14

GRETINA Gamma - ray Tracker Status and EPICS Usage

GRETINA Gamma - ray Tracker Status and EPICS Usage. Carl Lionberger Lawrence Berkeley National Laboratory. GRETINA Intro. Diminutive form of GRETA (Gamma Ray Energy Tracking Array) = ¼ GRETA Developed by same group as Gammasphere

Download Presentation

GRETINA Gamma - ray Tracker Status and EPICS Usage

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. GRETINAGamma-rayTrackerStatusandEPICSUsage Carl Lionberger Lawrence Berkeley National Laboratory EPICS Meeting 2005

  2. GRETINA Intro • Diminutive form of GRETA (Gamma Ray Energy Tracking Array) = ¼ GRETA • Developed by same group as Gammasphere • Ge crystals segmented and much closer together than in GS; no BGO separators • 36 segments/crystal • 28 crystals in 7 cryostats • http://grfs1.lbl.gov/ EPICS Meeting 2005

  3. Schedule (Fiscal Years) EPICS Meeting 2005

  4. Data Acquisition system Local Trigger Module Readout Computer Signal Digitizers 2.2 MB/s 66 MB/s Processing Farm Global Trigger Module Network Switch 70 dual Processors 30 Crystals 6.9 MB/s Aux. Det. Trigger Workstations, Servers Aux. Det. Data Data Storage 2.3 MB/s + Aux. Data EPICS Meeting 2005

  5. EPICS Meeting 2005

  6. Status • Testing detectors • Have custom digitizer (VME) • Developing EPICS support • Developing software requirements and algorithms • Cd2a/3a EPICS Meeting 2005

  7. EPICS Meeting 2005

  8. EPICS Meeting 2005

  9. EPICS Meeting 2005

  10. EPICS Meeting 2005

  11. EPICS Meeting 2005

  12. EPICS Status • Drivers • GRETINA Digitizer • CAEN V977 Digital I/O • CAEN V830 Scaler • One test IOC EPICS Meeting 2005

  13. EPICS Tools • Edm • Vdct • CaPython • Sequencer • Channel Archiver • SCA EPICS Meeting 2005

  14. Projected PV count • Global 100– • expect several times increase • Per crate 625 * 28 crates = 17,500 • Might double EPICS Meeting 2005

More Related