Samoa Pulp Mill Case

Samoa Pulp Mill Case. PST Support to EPA Region IX Samoa, CA & Longview, WA. Northwest Area Committee Meeting – November 2013. Constructed in 1963 as a pulp manufacturing facility Abandoned in 2008

aimee
Download Presentation

Samoa Pulp Mill Case

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Samoa Pulp Mill Case PST Support to EPA Region IX Samoa, CA & Longview, WA Northwest Area Committee Meeting – November 2013

  2. Constructed in 1963 as a pulp manufacturing facility • Abandoned in 2008 • 4 million gallons of caustic liquids (pH>13) & 10k gallons of various acids (pH<1) remain onsite

  3. Region IX Requested PST Support • PST mobilized the chemical pump load and HMRT to Samoa, CA • 165,000 gallons pumped from 2 pulp liquor tanks to 10 frac tanks • Reduced risk of tanks overflowing due to rainwater accumulation

  4. Projected Operations • Fabrication/construction of pipeline at Samoa facility to allow for pumping of product from tanks to tank barge • Start 18NOV – anticipated duration 2-3 weeks • Fabrication/construction of pipeline at KapStone Container Corporation (formerly Longview Fiber Company) for offload • Start 02DEC – anticipated duration 2-3 weeks • First barge loading of product in Samoa, CA • Start 06JAN – anticipated duration 7-10 days • First barge unloading in Longview, WA • Start 19JAN – anticipated duration 7-10 days