KaniaSOM / Brennan Hall Presentation Outline • Project Background • Introduction • Project Team • Construction • Structure • Information Technology • Wireless LAN Breadth Study • Wireless LAN • Access Points • IP Phones • Interactive Whiteboards • Video Conferencing • Structural Depth Study • Loads • Lateral System • Gravity System Conclusions Acknowledgements Questions • Scheduling/Cost Breadth Study • Material Costs • Construction Schedule • Final Cost Figures
KaniaSOM / Brennan Hall Project Background • Introduction • Five-story office/classroom building • 68,500 square feet • $12.3 million project • 1st and 2nd floors primarily classrooms • 3rd and 4th floors primarily faculty offices • 5th floor executive board room and catering facilities
KaniaSOM / Brennan Hall Project Background • Project Team • Owner – University of Scranton • Architects – Burkavage Design Associates • Structural Engineer – QproQ Engineering, Inc. • Geotechnical Consultant – Geo-Science Engineering • General Contractor – Sordoni Construction Services
KaniaSOM / Brennan Hall Project Background • Construction • Started March 1999 • Completed August 2000 • CM at risk delivery method • Adjacent dorms constructed at same time • Subcontractor lump sum bids
KaniaSOM / Brennan Hall Project Background • Structure • Structural steel framing • Fully rigid moments frames • Concrete-filled composite metal deck • Column spread and continuous wall footings
KaniaSOM / Brennan Hall Project Background • Information Technology • Showcase instructional technologies and conference center flexibility • Touch screen control of lighting, computing, and audio/video components • Overhead projector, motorized screens, image visualizers, DVD & CD players • High-end video displays, theatre like sound and video conferencing in executive conference center • Auditorium featuring theatre like audio and video environments
KaniaSOM / Brennan Hall Presentation Outline • Project Background • Introduction • Project Team • Construction • Structure • Information Technology • Wireless LAN Breadth Study • Wireless LAN • Access Points • IP Phones • Interactive Whiteboards • Video Conferencing • Structural Depth Study • Loads • Lateral System • Gravity System Conclusions Acknowledgements Questions • Scheduling/Cost Breadth Study • Material Costs • Construction Schedule • Final Cost Figures
KaniaSOM / Brennan Hall Structural Depth Study • Loads • From AISC “Manual of Steel Construction” • Dead loads • Roof dead (no ballast) 16.7 psf • Roof dead (with ballast) 26.7 psf • Floor dead 100 psf From ASCE 7-02 • Live loads • Corridors 80 psf • Classrooms 40 psf • Offices 50 psf • Snow load 30 psf
KaniaSOM / Brennan Hall Structural Depth Study • Loads • As Calculated by RAM Frame • Wind loads N-S E-W • Roof level 12.2 kips 14.4 kips • Fifth Floor 21.5 kips 22.9 kips • Fourth Floor 20.5 kips 21.7 kips • Third Floor 21.7 kips 19.9 kips • Second Floor 22.5 kips 18.3 kips • Total 98.4 kips 97.2 kips • Seismic loads • Total Building Weight 5690 kips • N-S Base Shear 246.7 psf • E-W Base Shear 284.5 psf
KaniaSOM / Brennan Hall Structural Depth Study • Lateral System • Advantages • Eliminate high cost of steel moment connections • Reduce steel erection time by eliminating steel moment connections • Six reinforced concrete shear walls • Four located on the perimeter • Extend all five floors • Two located in the interior • Only extend four floors • Very rigid, very small deflections • Massive walls and footings to resist overturning moments
KaniaSOM / Brennan Hall Structural Depth Study Lateral System
KaniaSOM / Brennan Hall Structural Depth Study Lateral System
KaniaSOM / Brennan Hall Structural Depth Study Lateral System
KaniaSOM / Brennan Hall Structural Depth Study • Gravity System • Replace wide flange infill beams with open web steel joists • Advantages • Reduce weight of floor system • Improve efficiency of floor system • Concerns • Fire Protection • Floor Vibrations
KaniaSOM / Brennan Hall Structural Depth Study • Gravity System Typical joist layout
KaniaSOM / Brennan Hall Structural Depth Study • Gravity System Fire Protection • Design No. G708 from U.L. “Fire Resistance Directory” • 2 hour fire rating • W8X28 min. beam size • Normal weight concrete, f’c = 3500 psi • Form deck with 2 ½” pitch, ½” corrugations • min. 16K6 joists spaced at 3’-6” max. • Spray-applied fire resistive material • Metal lath (optional)
KaniaSOM / Brennan Hall Structural Depth Study • Gravity System Fire Protection • Design No. G708 from U.L. “Fire Resistance Directory”
KaniaSOM / Brennan Hall Structural Depth Study • Gravity System Floor Vibrations • Calculations based on AISC’s Design Guide 11 • Applied loads • Live load 11 psf • Misc. 4 psf • Joist mode frequency 7.8 Hz • Girder mode frequency 6.0 Hz • Combined mode frequency 4.8 Hz • Walking stiffness evaluation • Acceleration limit 0.43%g • Less than office limit of 0.5%g
KaniaSOM / Brennan Hall Presentation Outline • Project Background • Introduction • Project Team • Construction • Structure • Information Technology • Wireless LAN Breadth Study • Wireless LAN • Access Points • IP Phones • Interactive Whiteboards • Video Conferencing • Structural Depth Study • Loads • Lateral System • Gravity System Conclusions Acknowledgements Questions • Scheduling/Cost Breadth Study • Material Costs • Construction Schedule • Final Cost Figures
KaniaSOM / Brennan Hall Scheduling/Cost Breadth Study • Material Costs • Moment connections removed • Steel beams removed • Steel columns removed • Spread footings removed • Reinforced concrete shear walls added • Spread footings added
KaniaSOM / Brennan Hall Scheduling/Cost Breadth Study Material Costs
KaniaSOM / Brennan Hall Scheduling/Cost Breadth Study • Construction Schedule • Time saved in steel erection • No moment connections • Fewer steel members • Time for concrete walls to reach 75% strength • Steel attached to concrete walls • Cost of steel erection crew • Cost of concrete frp crew
KaniaSOM / Brennan Hall Scheduling/Cost Breadth Study Construction Schedule • Extra construction time • Extra construction cost
KaniaSOM / Brennan Hall Scheduling/Cost Breadth Study • Final Cost Figures • Material costs • Extra construction cost • Final cost savings
KaniaSOM / Brennan Hall Presentation Outline • Project Background • Introduction • Project Team • Construction • Structure • Information Technology • Wireless LAN Breadth Study • Wireless LAN • Access Points • IP Phones • Interactive Whiteboards • Video Conferencing • Structural Depth Study • Loads • Lateral System • Gravity System Conclusions Acknowledgements Questions • Scheduling/Cost Breadth Study • Material Costs • Construction Schedule • Final Cost Figures
KaniaSOM / Brennan Hall Wireless LAN Breadth Study • Wireless LAN • Advantages • Less wire and cable throughout building • More flexible system • Reduce overhead costs caused by moves, extensions to networks, adding individuals • Can serve as hotspot for students with laptops • Can connect other buildings to same network • Installing network in older buildings is easy • 802.11a • 64 users per access point • Lower possibility of interference • Good for; dormitories, computer labs, conference rooms, VoIP
KaniaSOM / Brennan Hall Wireless LAN Breadth Study • Access Points • 64 users per access point • Connected via ethernet to wired backbone
KaniaSOM / Brennan Hall Wireless LAN Breadth Study • IP Phones • PC Based Phones • Software that allows all computers to be used as internet protocol phones • Each individual’s extension follows them to any computer he/she is logged on to • Provides every feature that standard phones offer • Teleconferencing capabilities • Desktop IP Phones • Connected via ethernet to wired backbone • Located in secretary/waiting areas
KaniaSOM / Brennan Hall Wireless LAN Breadth Study • Interactive Whiteboards • Replaces chalkboard, overhead projector and screen • Can function simply as a whiteboard • Can display computer images • Can save handwritten notes to print or post on course websites
KaniaSOM / Brennan Hall Wireless LAN Breadth Study • Video Conferencing • Built in conferencing with multiple video and audio sites • Dual LCD monitors • Add a PC to the meeting • See live PC presentations and presenter simultaneously
KaniaSOM / Brennan Hall Presentation Outline • Project Background • Introduction • Project Team • Construction • Structure • Information Technology • Wireless LAN Breadth Study • Wireless LAN • Access Points • IP Phones • Interactive Whiteboards • Video Conferencing • Structural Depth Study • Loads • Lateral System • Gravity System Conclusions Acknowledgements Questions • Scheduling/Cost Breadth Study • Material Costs • Construction Schedule • Final Cost Figures
KaniaSOM / Brennan Hall Conclusions • Conclusions • Conclusions yet to come
KaniaSOM / Brennan Hall Presentation Outline • Project Background • Introduction • Project Team • Construction • Structure • Information Technology • Wireless LAN Breadth Study • Wireless LAN • Access Points • IP Phones • Interactive Whiteboards • Video Conferencing • Structural Depth Study • Loads • Lateral System • Gravity System Conclusions Acknowledgements Questions • Scheduling/Cost Breadth Study • Material Costs • Construction Schedule • Final Cost Figures
KaniaSOM / Brennan Hall Acknowledgements • I would like to thank • James Kerns, PE, QproQ Engineering • James Devers, AIA, U of S Physical Plant • David Wilson, AIA, U of S Physical Plant • Francis Kranick, U of S Physical Plant • Ronald Skutnick, Uof S Network Resources • Andrew Shedlock, Sordoni Construction • Don Flynn, Burkavage Design Associates For all of the time and information they have contributed to this project.
KaniaSOM / Brennan Hall Presentation Outline • Project Background • Introduction • Project Team • Construction • Structure • Information Technology • Wireless LAN Breadth Study • Wireless LAN • Access Points • IP Phones • Interactive Whiteboards • Video Conferencing • Structural Depth Study • Loads • Lateral System • Gravity System Conclusions Acknowledgements Questions • Scheduling/Cost Breadth Study • Material Costs • Construction Schedule • Final Cost Figures
KaniaSOM / Brennan Hall Questions ?