An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Brief summary of run #10 (23-25 September) and plan for the rest of commissioning Shinji Machida on behalf of the beam commissioning team ASTeC/STFC/RAL 27 September 2010

  2. Aims • Understand rf system • Phase with respect to beam • Vector sum voltage • Time of flight with +2 mm shifted lattice. • Closed orbit measurement and its correction. • Understand “improvement” by QD27.

  3. rf system (1)vector sum • When all cavities have the “same” phase • Observed syn period is 20 turns instead of 14. • A beam sees only a half of rf voltage, 0.5 MV. • When 10 cavities have the “same” phase and 9 cavities have the opposite phase • Observed syn period is 43 turns instead of 61. • A beam sees twice as much voltage, 0.11 MV. • Individual phase has to be set by using a beam.

  4. rf system (2)phase with respect to a beam • Global phase moves with respect to a beam once we use “sweep rf” button. • Necessary after trip. • Make it hard to determine individual cavity phase by single cavity excitation.

  5. rf system (3)measurement of individual phase • With all cavity turned on with 10 acc. and 9 dec. phase, change phase of only one cavity. • Can find zero crossing of the cavity. • Difficult to distinguish rising or falling edge. • Change individual cavity phase and monitor rf voltage of the cavity (Yuri). • Beam loading tells thephaseof crest. • Although it is tedious to find crest phase of the all cavities, it is the only promising way to determine individual rf phase.

  6. Lattice • With all the quadrupole +2 mm shifted outside, time of flight increased as expected. • There is enough aperture with 20.5 MeV/c equivalent momentum and the nominal QD/QF ratio. • Shifted quadrupole lattice helps to match rf frequency range (+1.5, -4 MHz) to ToF. • Issue is whether we still have enough move for COD correction. QD has +/- 2.6 mm move only.

  7. COD measurement and correction (1)method • Total 12 BPM cables are available. • 12H or V signalsatonetime. • Switch off the machine 3 times to measure the whole 42 cell BPM for horizontal COD measurement and another 3 switch off for vertical. • Seems the only way at least before shutdown.

  8. COD measurement and correction (2)preliminary result • Both horizontal and vertical COD at BPM between QD and QF are measured. • One set with QD27 with the same current as the rest. Another set with QD27 with 10% more current. • Preliminary results show COD of more than +/- 6 mm in horizontal.

  9. COD measurement and correction (3)correction • Attempt to correct horizontal COD. • David analyzing the data.

  10. Next step (1)main issues • Toward the demonstration of acceleration, two major (may be more) problems to be fixed. • Set individual cavity phase to maximum vector sum. • Correct closed orbit distortion. • Fixlattice for the demonstration. • 14.5 MeV/c is the minimum momentum? • Need quadrupole shift for the matching of ToF?

  11. Beam time (1) • Run #1: 20-23 June 2010 • Run #2: 12-15 July 2010 • Run #3: 27-29 July 2010 • Run #4: 3-6 August 2010 end of 4 sector • Run #5: 13-15 August 2010 full ring • Run #6: 18-24 August 2010rf commissioning • Run #7: 30 August – 2 September 2010rf available • Run #8: 7-10 September • Run #9: 15-18 September • Run #10: 24-26 September • Run #11: 2-3 October • Run #12: 10-13 October

  12. Beam time (2) • Run #11: Saturday 2 – Sunday 3 October • Both Shift 2 and 3 • Mark’s data taking in tomography section on 2 October. • rf on 2 October, but no rf on 3 October. • May have additional shift(s) on 4 October. • Run #12: Sunday 10 – Wednesday 13 October • Shift 2 and 3 on 10 October. • Shift 3 only from 11 to 13 October, but shift 2 may become available. • May have additional shift(s) on 14 October. • 6 to 8 days before shutdown in the middle of October.

  13. Next step (2)lattice for the demonstration • Probably not a good idea to shift quadrupole to make injection easier and to match ToF. • At least +/- 1 mm translation should be reserved for COD correction. • 1.301 GHz rf synchronizes with revolution frequency of 18.5 MeV/c lattice with QD/QF=205/196 A. • Is it possible to inject 14.5 MeV/c equiv. or lower beam without quadrupole translation? • Need to lower QF current?

  14. Next step (3)individual phase measurement • Measure individual cavity phase at the next shift with rf. • Beam loading measurement seems to work. • May need one or two shifts to measure the phase of 19 cavities and measure vector sum. • Main subject of 2 October.

  15. Next step (4)COD correction • Analyze measured COD and calculate individual quadrupole shift for correction. • May need several correction algorism. • Measurement of response matrix if necessary. • Main subject of 3 October.

  16. Next step (5)plan for the final week • With 18.5 MeV/c equiv. beam and QD/QF=205/196 A lattice, • Correct COD. • Scan global rf phase for capturing in a bucket and deceleration in serpentine channel. • Measure tune vs turn for plausible case. • With 14.5 MeV/c (or less) equiv. beam, • Measure and correct COD • Scan global rf phase for acceleration in serpentine channel.

More Related