Run Summary. Run Meeting 15-11-12. Daily Summary. LHC: Fill in the morning as continuation of the one in the night, lost when TOTEM moved in Then problems in the LINAC and PS Then , two physics fills back to back (3287 and 3288, ongoing )

truman
Download Presentation

Run Summary

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RunSummary Run Meeting 15-11-12

  2. DailySummary • LHC: • Fill in the morningascontinuation of the one in the night, lostwhen TOTEM moved in • Thenproblems in the LINAC and PS • Then, twophysicsfills back to back (3287 and 3288, ongoing) • Fill3287 dumped by operator again, machine isrunningverystably • Interfill time of about 2.5 hours (from SB to SB) • LHCb: • Took data efficientlyduring the last part of fill 3286, no problems • Startedtaking data in fill 3287, butataround 8pm the AUG in the control room wasaccidentallyswitched off and welostpower in the surface • Problem with restarting the power, so the UPS ran out of batteries and full powerwascut in surface • Weloststorage, disks, control pcs and basically the whole network • Werecoveredeverything and tookdata from 2.50am onwardsagain • Moved VELO out with interlock box buttonafterwerealizedwewere in for a long recovery • Run 132301 was set to LOCAL, first half an hour isgood data… • - Takingdata efficientlyduringfill 3287, no problems Federico Alessio

  3. DailySummary (@9 am) Lost power • Maincomments: • weshouldhave a way to restartpowereasily, in an accessible way and with clearinstructions • the UPS batteriescould last longer • 10 minutes wouldhavebeenenough, just to allowdriving to the pit, as fast aswe can • can we put a small plexiglass panel in front of the AUGsthat can be broken or opened? • the AUGs are at the sameheight and position as the light buttons! (ithappenedbefore..) • VELO hadtroublesrecovering from the hard interlock, HV/LV wereconfused and took a while to restartitafterwerecovered the rest • Thanks to Rainer, Enrico, Christophand Clara whocame in to help usrestart the wholesystemuntildeep night! In conclusionweevenhadfun, especiallywhenwerealizedthat the runhasbeengoing on for about 5 hours deferringeverything… (but with VELO open and its HV/LV off…). TMUC and MUONC problem Federico Alessio

  4. Plan • Please, check that everything is running as it should • Take data • … Federico Alessio