1 / 37

Series Compensation and SSR - Concepts Jonathan Rose Planning Engineer

Series Compensation and SSR - Concepts Jonathan Rose Planning Engineer Resource Integration Department Workshop on NPRR 562, Subsynchronous Oscillations September 9, 2013. Presentation Outline. What are series capacitors? What is SSR? What causes SSR? Simultaneous outages.

airell
Download Presentation

Series Compensation and SSR - Concepts Jonathan Rose Planning Engineer

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Series Compensation and SSR - Concepts Jonathan Rose Planning Engineer Resource Integration Department Workshop on NPRR 562, Subsynchronous Oscillations September 9, 2013

  2. Presentation Outline • What are series capacitors? • What is SSR? • What causes SSR? • Simultaneous outages. • Understanding risk exposure. • Mitigating and Protectingagainst SSR risk. • What has ERCOT been doing?

  3. Series Compensation • The use of capacitors connected inline with transmission lines to cancel a portion of the transmission line impedance. • The “percentage of compensation” refers to the percentage of transmission line impedance offset or cancelled. • X = XL(1-XC/XL) = XL(1-k), where k = percent of compensation

  4. Series Compensation in CREZ Gray Alibates 50% Compensation Windmill Ogallala Oklaunion WillowCrk Long Draw Navarro SamSw Killeen Kendall

  5. Why use Series compensation? • Increase the power flow by reducing the line impedance • Improve the dynamic stability of the grid (by increasing the area under the power angle curve) • Reduce voltage variation • Relieve transmission bottlenecks • Increases capacity • Self-regulating (reactive power generated proportional to flow squared)

  6. Example of Benefit of Series CompensationScenario 1: Uncompensated Case [2] pg 114 of Bergen – Vittal, “Power System Analysis”.

  7. Example of Benefit of Series CompensationScenario 2: With Compensation

  8. Limitations of Series Compensation • The percent compensation limited to under 70% • Voltage profile – line voltage may reach 1.10 pu requiring extra insulation • Technically difficult to tie new generators into a series-compensated line • Adverse effects on the generator units due to sub-synchronous phenomena Illustrative Voltage Profile

  9. Presentation Outline • What are series capacitors? • What is SSR? • What causes SSR? • Simultaneous outages. • Understanding risk exposure. • Mitigating and Protectingagainst SSR risk. • What has ERCOT been doing?

  10. Sub-Synchronous Resonance (SSR) • Resonance: The tendency of a system under excitation to oscillate at certain frequencies. • Subsynchronous Oscillations*: A phenomena where growing quantities of power are exchanged between equipment at frequencies lower than 60 Hz. • Has the potential to break generator shafts, damage generator protection and series capacitor banks. • Adding Series Compensation to a power system introduces SSR concerns. Good Resonance Bad Resonance * Some texts prefer ‘subsynchronous oscillations’ as a general term instead of ‘subsynchronous resonance.’

  11. How does SSR happen? Shunt Capacitors ~ Inductive Capacitive Generators, Inductors, Load Most power system elements are inductive.

  12. How does SSR happen? Shunt Capacitors Series capacitors ~ Inductive Capacitive Generators, Inductors, Load When inductive and capacitive equipment match at certain frequencies, they create complimentary energy tanks, which can give rise to resonance.

  13. Mohave SSR Incident (1970)An example of SSR Torsional Interaction • Mohave generator: 1,580 MW coal-fired in NV. • Gradually growing vibration that eventually fractured a shaft section. • First investigations incorrectly determined cause. After 2nd failure in 1971 cause was identified as Subsynchronous Resonance. • An electrical resonance at 30.5 Hz excited a mechanical resonance at 30.1 Hz. • Problem was cured by reducing compensation percentage and installing a torsional relay. D. Baker, G. Boukarim, “Subsynchronous Resonance Studies and Mitigation Methods for Series Capacitor Applications,” IEEE 2005. D. Walker, D. Hodges, “Results of Subsynchronous Resonance Test At Mohave,” IEEE 1975.

  14. Presentation Outline • What are series capacitors? • What is SSR? • What causes SSR? • Simultaneous outages. • Understanding risk exposure. • Mitigating and Protectingagainst SSR risk. • What has ERCOT been doing?

  15. SSR Manifestations Different situations can cause SSR Torsional Interaction (TI) Electrical resonance frequency of system close to natural torsional resonance frequency of mechanical system. Can result in shaft failure. Usually takes several seconds. Transient Torque Electrical resonance frequency of system close to natural torsional resonance frequency of mechanical system, however adequate damping prevents growing oscillations. Can result in shaft fatigue. Induction Generator Effect (IGE) Purely electrical phenomenon; no mechanical component. Affects wind and fossil generators. Self excitation because synchronous motor circuit acts like an induction generator at subsynchronous frequencies. The effective slip can cause negative resistance, hence negative damping. Can result in rapidly growing currents or voltages. Subsynchronous Control Interaction (SSCI) Control system of power electronic device (e.g. HVDC, wind farms, or SVC) has an unintended resonant point close to the system electrical resonance. Result: Rapidly growing currents or voltages. P.M. Amderspm, B.L. Agrawal, “Sybsynchronous Resonance in Power Systems.” IEEE Press, 1990.

  16. South Texas SSCI Event (2009) • Series capacitors installed on long 345 kV lines to allow full loading. • 1,000 MW of wind farms connected to Ajo. Many are Type III. 345 kV series compensated lines

  17. South Texas SSCI Event (2009) • A fault occurred on the Ajo to Nelson Sharpe line due to a downed static wire. • Fault cleared in 2.5 cycles by opening this line. • The wind farms were then radially connected to the Ajo to Rio Hondo series compensated transmission line. • The Doubly-Fed Induction Generators (DFIG) controlled by a voltage source converter introduces negative damping. • Undamped oscillations at 22 Hz. • Voltages reacted approximately 2.0 pu in ~150 ms. • The series capacitors bypassed approximately 1.5 seconds. • Damage to wind generators and series capacitors occurred. From AEP presentation by Paul Hassink, “Sub-synchronous Control Interaction,” Utility Wind Integration Group Spring Workshop April 15, 2011 Also: http://www.elforsk.se/Global/Vindforsk/Konferenser/HF_symposium_111206/Gotia_Power_V309_subsynchronus_resonence.pdf

  18. Fault Recorder, South Texas Event Slide from AEP presentation by Paul Hassink, “Sub-synchronous Control Interaction,” Utility Wind Integration Group Spring Workshop April 15, 2011.

  19. Presentation Outline • What are series capacitors? • What is SSR? • What causes SSR? • Simultaneous outages. • Understanding risk exposure. • Mitigating and Protectingagainst SSR risk. • What has ERCOT been doing?

  20. Effect of Outages • Can increase coupling between a series capacitor and generator. • Two outages make the generator at Ogallala radial to the CTT series capacitors. Gray Alibates 50% Compensation Windmill Ogallala Oklaunion WillowCrk Long Draw

  21. Effect of Outages • Five double-circuit outages make Limestone radial to W.Shackelford – Navarro series compensated line. • Even with all of these outages, case solves under min load conditions. Venus / Midlothian Watermill Navarro Big Brown Wshackelford - Navarro Limestone Jewett Twin Oak

  22. Effect of Outages • Can increase coupling between a series capacitor and generator. • Must consider planned and forced outages. • SSR studies are labor-intensive and do not lend towards being studied on-demand • Therefore possible outage combinations must be studied ahead-of-time by Planning. • Any generator that is up to FIVE outages away from being radial to a series capacitor is subject to SSR study.

  23. Where did N-5 come from? • N-5 came from a calculation of outage probabilities in 2012 by Resource Integration. • Uses IEEE paper, “An IEEE Survey of U.S. and Canadian Overhead Transmission Outages at 230 kV and Above.”IEEE Transactions on Power, January 1994. Probability that Outages Don’t Overlap There is a 99.8% chance that a random N-5 combination will not occur as a simultaneous planned outage in 50 years.

  24. Presentation Outline • What are series capacitors? • What is SSR? • What causes SSR? • Simultaneous outages. • Understanding risk exposure. • Mitigating and Protectingagainst SSR risk. • What has ERCOT been doing?

  25. How Study for SSR? • Frequency scans • EMT1 Simulation Graph resistance & reactance vs. frequency. Look for dips & crossovers. Less accurate so designed to be conservative. If frequency scan shows possible exposure risk, EMT simulation may be able to dismiss the exposure risk. EMT simulations are more accurate. 1Electromagnetic Transient simulation: A time-domain analysis similar to a dynamic or “stability” analysis but capable of simulating off-nominal frequencies other than 60 Hz. Such simulations generally require more detailed models.

  26. Who’s At Risk? -- General Observations • More Risk: • Electrically closer to series capacitors. • Type III wind farms. • Long shaft / multi-mass generators (Coal, NG Steam, Combined Cycle). • Less Risk: • Type IV wind farms. • Type III wind farms with special damping controls. • Hydro, CTs, reciprocating engines. • Solar inverters. • HVDC ties. • For new generators, ERCOT does not pre-approve certain technologies. A study or letter is required!

  27. Presentation Outline • What are series capacitors? • What is SSR? • What causes SSR? • Simultaneous outages. • Understanding risk exposure. • Mitigating and Protectingagainst SSR risk. • What has ERCOT been doing?

  28. Protection vs. Mitigation? • Protection • Involves forced tripping (removal of generator or series capacitor). • Disruptive for a system that is already in a weakened state due to outages (“double blow”). • Generally recommended as backup means of defense. • Mitigation • Involves reducing exposure to SSR risk. • Generally allows the resource to continue operating, even when outages place the unit in stronger electrical coupling with a series capacitor. • In many cases, may completely eliminate risk. • E.g. Horse Hollow Energy Center installed mitigation which allowed the wind turbines to operate radially to the series-compensated transmission line owned by NextEra. Protection or Mitigation? Recommend Both!

  29. Mitigating SSR Several options to reduce or eliminate risk. • Outage coordination • Special Protection Schemes* • Generator PSS tuning • Wind turbine controller adjustments • Damping Filters • Thyristor-controlled series capacitors Suggest 4-square chart: gen vs TSP; low cost vs high cost. Also: Wind developers may select a different turbine model; new fossil plants may modify generator masses or install amortisseur windings; SVCs outfitted with special control schemes.

  30. Protecting Against SSR

  31. What was done elsewhere? [1] • Excerpt from text [2]: “In contrast to Mohave, Navajo Project SSR is very complex due to the network. Significant technological advancement in the analysis of SSR [in the 3 yrs since Mohave incident], leading Navajo to announce it would proceed construction as planned.” • Mitigation for Navajo: • Pole amortisseur windings. • Arc gaps that reduce transient torque risk. • Static blocking filter. • Excitation damping control. • Torsional relay protection. [1] D. Baker, G. Boukarim, “Subsynchronous Resonance Studies and Mitigation Methods for Series Capacitor Applications,” IEEE 2005. [2] P. Anderson, R. Farmer, “Series Compensation of Power Systems.” PBLSH! 1996.

  32. Presentation Outline • What are series capacitors? • What is SSR? • What causes SSR? • Simultaneous outages. • Understanding risk exposure. • Mitigating and Protectingagainst SSR risk. • What has ERCOT been doing?

  33. What about the 2010 CREZ Reactive Study? • New Wind Generators • Reactive study tested the effectiveness various mitigations including bypass filter and TCSC but could not test the effectiveness of upgraded wind turbine control systems as details on these designs were not available at the time. Study did not issue a recommendation. • Existing Generators • The Reactive study included SSR studies of several existing generators that were thought might be at risk. Some of the studies confirmed risk and recommended additional analysis. • Additional analysis is now being performed. Some generators have been cleared as ‘no risk’ because better generator data became available and a more detailed analysis was performed. • ERCOT has since identified additional generators that require SSR studies. Many of these studies have already been completed; some are still ongoing.

  34. Role of ERCOT Planning in SSR (Existing Resources) • ERCOT analyzed risk exposure of all existing power plants. • For exposed plants, • Contacted TSP and generator. • Coordinated study. • Facilitate resolution. • Several thermal and wind plants are already moving towards resolution.

  35. Role of ERCOT Planning in SSR (New Resources) • New resources analyzed for risk in GINR screening study • Screening study report indicates whether exposed for SSR. • If exposed, then developer must either: • Run a detailed study. • Typically not performed by TSP.  Contract out. • Obtain letter from generator manufacturer. • Explains why not at risk for SSR and substantiated with technical reasoning or a study simulation. • New resources not allowed to synchronize until SSR issues resolved.

  36. Rare Events Do Happen • December 22, 1982: West Coast Blackout (from NERC) • This disturbance resulted in the loss of 12,350 MW of load and affected over 5 million people in the West. The outage began when high winds caused the failure of a 500-kV transmission tower. The tower fell into a parallel 500-kV line tower, and both lines were lost. The failure of these two lines mechanically cascaded and caused three additional towers to fail on each line. When the line conductors fell they contacted two 230-kV lines crossing under the 500-kV rights-of-way, collapsing the 230-kV lines. The loss of the 500-kV lines activated a remedial action scheme to control the separation of the interconnection into two pre-engineered islands and trip generation in the Pacific Northwest in order to minimize customer outages and speed restoration. However, delayed operation of the remedial action scheme components occurred for several reasons, and the interconnection separated into four islands…

  37. Questions?