Guidebook Progress, & Maintenance Plan. Chris Dore. Guidebook Timeline. Guidebook Chapters. 10 “Yet to be” Approved Chapters 1.A.1 Energy industries 1.A.2 Manufacturing Industries and Construction (Combustion) 1.A.4 Small combustion
E N D
Guidebook Progress, & Maintenance Plan Chris Dore
Guidebook Chapters • 10 “Yet to be” Approved Chapters • 1.A.1 Energy industries • 1.A.2 Manufacturing Industries and Construction (Combustion) • 1.A.4 Small combustion • 1.B.1.a Fugitive emissions from solid fuels - coal mining/handling • 2.A.7.c Storage, handling, transport of mineral products • 2.B Chemical industry • 2.C.1 Iron and steel production • 2.C.2 Ferroalloys production • 2.C.5.f Storage, handling, transport of metal products • 6.B Waste-water handling • 11B Forest Fires, and Geological Seepage • Extensive work conducted on all of these Chapters to bring them up to an acceptable standard.
Guidebook Chapters • Edited Chapters (Already Approved) • 1.A.3b Road Transport • 1.A.3a Aviation • 2 Key Category Analysis • 8 Projections • Maintenance Plan Items • As part of this update process, a number of items have already been flagged as being allocated to the respective EP maintenance plans
Maintenance Plan: 1 • Short-term & Long-term • We need a plan that can be implemented now! • But with well thought through ideas ready to be used if/when funds/support become available.
Maintenance Plan: 2 • Current Proposal for EPs • EPs to continue their work in much the same way. But... • Capture GB updates in a standardised way • Capture “development” ideas in a standardised way • ... and report these in a short annual workplan.
Maintenance Plan: 3a • Other Priority Proposals • Better defined roles and responsibilities • TFEIP Executive • TFEIP Committee (Exec + EP Leaders) • EP Leaders • EEA- publishers of the Guidebook
Maintenance Plan: 3b • Other Priority Proposals • Encourage greater participation/ support from parties • EMEP SB “... invited the Task Force to present to it at its thirty-third session a draft maintenance plan specifying tasks, responsibilities and estimated cost for the Guidebook maintenance” • EMEP SB... “Called upon the Parties to the EMEP Protocol to consider making voluntary contributions to guarantee the provision of up-to date and good quality data;
Maintenance Plan: 3c • Other Priority Proposals • Seek additional support for Comb & Ind. EP • Encourage greater participation in specific EPs from industry • Further investigate the proposed EFDB work by SYKE
Maintenance Plan: 4 • Longer-Term • Use the “development” plans to encourage more participation/support • Look into opportunities of arranging more centralised funding & party contributions. • We need to review the EP structure (a focal point for Waste would be helpful). • We need to review whether an internet forum, or EP e-mails would be helpful.
AIR POLLUTANT EMISSION FACTOR LIBRARY • Not possible to include all countries’ all sources/techniques/conditions/emissions in a GB • Use of EFs that better reflect national conditions instead of defaults is encouraged • WOULD BE A COLLECTION OF REFERENCES FOR DEVELOPING NATIONAL EFs • AND DISCOVERING SOURCES/EMISSIONS NOT YET INCLUDED • especially in the energy / industrial processes/ solvent&product use sectors • WOULD INCLUDE EFs with • SOURCE, PROCESS TECHNIQUE + ABATEMENT INFO • COUNTRY/REGION where used • REFERENCES TO DOCUMENTATION • CAN EXCLUDE or INCLUDE GB VALUES (with clear reference/status indication) • No resources needed or extra work for the EPs • SYKE offers to do the job with support from existing tasks e.g. OECD PRTR • Resource Centre & communicate with other corresponding work (IPCC, EGTEI,..
Recap • All GB Chapters should now be at an acceptable quality standard • Please discuss details in the EP meetings • A maintenance plan with few changes can be used now • First stages to be trialled in the EP meetings • We have longer term ideas and aims, which are dependent on more support/funding • Please suggest other ideas in EPs or Plenary