Issues inherited by MSEDCL (June ’05) • Demand Supply Gap of 3500 to 4000 MW • High T&D Loss – 35.2% (04-05) • Low Collection Efficiency – 85.2% • Deteriorated Distribution Infrastructure (Aged & overloaded transformers & S/S) • Pending applications for connections • Loss making Entity (Rs. – 998 Cr. In 2004-05) • Poor consumer response
Action Plan to Resolve the Issues • MSEDCL’s Mission Statement • 10 Point Action Plan • Communication Plan • Organizational Changes
Annual Plan for 2006-07Physical Targets • 280 Nos. 33/11KV, 22/11KV, 22KV Sw Substations • Connections to 90,000 pumps • 6 Lakh unmetered Ag. consumers to be metered • Metering of 95,394 DTCs • LTLM scheme for 62,666 DTCs • Fixed capacitors for 19,900 DTCs • 10,653 Nos. new DTCs to be installed & 19000 Nos. for 3-Phase HVDS • 25,164 Nos. Single Phase HVDS transformers proposed • 5000 Nos. DTCs for Gaothan feeder separation • 19,000 Km 11KV (HT) line proposed