Department of Energy CORPORATE NETWORK (DOEnet)

Department of Energy CORPORATE NETWORK (DOEnet). Office of the Associate CIO for Operations Site Coordinating Committee Video Teleconference December 13, 2000. Agenda. Introductions Network Performance/Operations Implementation/Design Review Network Security Open Discussion/Next Meeting.

ajaxe
Download Presentation

Department of Energy CORPORATE NETWORK (DOEnet)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Department of Energy CORPORATE NETWORK (DOEnet) Office of the Associate CIO for Operations Site Coordinating Committee Video Teleconference December 13, 2000

  2. Agenda • Introductions • Network Performance/Operations • Implementation/Design Review • Network Security • Open Discussion/Next Meeting

  3. Network Outages • October Outages • 2 Circuit or PVC Outages • EML (New York, NY) • WAPA (Denver, CO) • 4 Hours of Site Outages

  4. Help Desk Activities November 2000 – 16 Tickets • 2 Circuit Outages • 3 HQ Configuration - Router • 1 HQ Configuration - Firewall • 3 Performance Anomalies • 2 Site Configuration • 1 Site Hardware • 1 Power • 3 Other / NTF / Request

  5. Implementation StatusInitial Connectivity • Carlsbad Area Office - Local Exchange Carrier has provided Sprint with a delivery date of January 2001 for a circuit into Carlsbad.

  6. Implementation Status -DS-3 Circuits Upgrades • Idaho Operations Office - On hold • NREL/Golden - On hold • Ohio Field Office - On hold

  7. DOEnetDesign Review • Evaluating Carrier Recommendations • Reduce PVC Size/potential cost savings • Deliver full T-1s or bundled T-1s where DS-3s cannot be justified • Add traffic to the network • Actions to “right size” network

  8. Network Security Pilot - 10 Sites • DOEnet Security Enhancements partially completed • Objective - Address Office of Assurance Review • Methods • Provide network perimeter protection • Stateful Inspection Firewalls • Implement network intrusion detection capability at each site

  9. Network Security PilotIndividual Site Status • Richland Ops Completed • Oakland Ops Completed • SPRO (New Orleans) Completed • WAPA Completed • Oak Ridge Ops Completed • NREL/Golden Completed • Nevada Ops Completed • Albuquerque Ops Scheduled 12/14/00 • Chicago Ops Postponed • Idaho Ops Postponed

  10. Customer Service & Support • Help Desk 877-823-3205 • Network Operations & Security (Firewall) • Voice Mail automatically rings to Network Engineer on-call (importance of leaving a message) • Continue to coordinate requirements as soon as they are known

  11. General Information • Request for Connectivity • Bonneville Power Administration • Compliance with connection requirements verified - cutover pending • Connectivity will be established with BPA/HQ

  12. Next Meeting(s) SCC Video Teleconference - January 10, 2000

  13. DOEnet HQ Team Federal Project Manager Rich Otis 301-903-5310 Project Coordinator Toni Love 757-365-0039 Network Engineers Kellep Charles (KC) Hieu Dang Warren Jordan Greg Magann Bobby Rizvi Help Desk 877-823-3205