1 / 12

Ogallala Stakeholder Meetings with

Ogallala Stakeholder Meetings with Governor Brownback and Groundwater Management District No. 1 & 3. Tracy Streeter, Kansas Water Office Lane Letourneau, Ks Dept of Ag Division of Water Resources. 2012 Water Legislation. SB 272 - Multi-Year Flex Account Program

akiko
Download Presentation

Ogallala Stakeholder Meetings with

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Ogallala Stakeholder Meetings with Governor Brownback and Groundwater Management District No. 1 & 3 Tracy Streeter, Kansas Water Office Lane Letourneau, Ks Dept of Ag Division of Water Resources

  2. 2012 Water Legislation • SB 272 - Multi-Year Flex Account Program • SB 310 - Local Enhanced Management Areas • HB 2451 - Water Right Abandonment • SB 148 - Water Right Division Agreements and Sand and Gravel Project Permit • HB 2516 - Kansas Water Banking Act

  3. MYFA Implementation • Senate Bill 272 signed by Governor Brownback on March 5 • Eliminated mandatory 10% conservation factor • Provides NIR alternative for MYFA quantity • Allows GMD to develop a 3rd option for Q calculations • Flexibility within a water right, not to increase long term use • Application form made available on May 10 • Revised form made available June 25 • Filing deadlines of 7/15 and 10/1 • Information meeting in Great Bend 9/11 with KFB • Almost 400 received to date • ¾ are drought term conversions

  4. Applications by the Numbers July 14, 2011 Today 908 total pending new applications 429Regular Applications 14 pending DT 97 pending term (non-DT) 388 MYFA applications have been filed so far (293 DT conversions - 76%) 2,256 drought term permits processed since implementation 595 temporary applications 238 total pending change apps • 322 total pending new applications • 314 temporary applications (oil and gas exploration) • 193 total pending change applications

  5. Drought Terms and Enforcement • Prolonged drought • Committed not to increase or decrease enforcement activity. • If your drought term is overpumped cease pumping to avoid a fine • No additional DT, MYFA is the tool • Aquifer neutral

  6. Drought Terms and Enforcement • Choose not to enroll in a MYFA after overpump occurs • Penalty will be $500 and a suspension of the amount overpumped • Reduces the use in 2013 • If overpumped before, the fines and penalties could be significantly greater

  7. LEMA Implementation • GMD No. 4 in the process of implementing a LEMA in Sheridan 6 • Revised Management program has been approved by the Chief Engineer and adopted by the GMD (July 2012) • Sheridan 6 LEMA proposal approved. • First Hearing is Sept 13

  8. LEMA Implementation (con’t) • Two hearings required: • Initial hearing to determine if LEMA corrective controls are needed to address water resource problem and preliminary confirmation of boundary • Second hearing to determine whether to adopt the GMD’s proposed corrective controls • Developing implementing regulations • We will move forward with Sheridan 6 hearings under statutory guidance and IGUCA regulations adopted in 2010 consistent with statute.

  9. HB 2451 - Abandonment • Applies to areas closed by rule or order of the chief engineer, groundwater only • Water Use reports still required

  10. HB 2516 – Water Banking • Review GMD 5 bank review committee recommendations • Implement results in revised bank charter and regulations.

  11. Questions?

More Related