International Industrial Assessment Center Training Program September, 2002
Program History Established by UCSC in 1976 within U.S. Department of Commerce as the Energy Analysis and Diagnostic Center (EADC) program Four initial university participants Moved to the Department of Energy in 1977 Currently 26 Centers
Energy Efficient Equipment Program Benefits Pollution Prevention Equipment
Program Benefits IACs have recommended cumulative cost savings of over $700 million Technical assistance has been provided to over 9,000 plants More than 2,000 engineering students have been trained
University City Science Center Non-profit organization with 30 academic institutions as shareholders Lines of Business: Technology Park Development Port of Technology Program Programmatic Centers of Excellence
Industrial Technology and Energy Management Division (ITEM) Science Center Programmatic Center of Excellence Engineering consultant organization Areas of business: Program management Industrial assessments Training Industry profiles Technology assessments Best practices in manufacturing
ITEM Key Personnel: William J. Clark—Executive Director Gwen P. Looby—Manager, Administration and Operations Jimmy Lew—Project Engineer
San Francisco State Univ. IAC IAC established in 1992 Dr. Ahmad Ganji, Director Dr. Shy-Shenq Liou, Assistant Director 25 IAC assessments performed each year Completed more than 250 assessments
International IACs POLAND UKRAINE CHINA MEXICO EGYPT GHANA SOUTH AFRICA
旧金山州立大学 工业评估中心实习
中心主任逐项核对布置给学生的任务,按具体情况调整时间进度。中心主任逐项核对布置给学生的任务,按具体情况调整时间进度。
学生小组长根据问卷和电话采访所获得的信息,汇报第二天赴现场评估的工厂的工艺流程和可能的节能潜力。学生小组长根据问卷和电话采访所获得的信息,汇报第二天赴现场评估的工厂的工艺流程和可能的节能潜力。
由经理带领参观生产线 (不许拍照)
重点用能设备测量 (不许拍照)
有专门的程序用于计算,常用的公式贴在墙板上。有专门的程序用于计算,常用的公式贴在墙板上。
报告经三次修改后交给工厂同时送管理中心,管理中心发现严重问题要返回给工厂。报告经三次修改后交给工厂同时送管理中心,管理中心发现严重问题要返回给工厂。