1 / 3

A Year in Review of the Key Elements Relating to Interoperability

A Year in Review of the Key Elements Relating to Interoperability. Enhanced LPT Billing System Colorado DMV Collaborations: Temporary Permit (Plate) Redesign Temporary Permit Data Entry Vehicle Registration Hold Program Equipment Enhancements: OCR Retrain Lane, RFID and Imagery

alban
Download Presentation

A Year in Review of the Key Elements Relating to Interoperability

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. A Year in Review of the Key Elements Relating to Interoperability

  2. Enhanced LPT Billing System • Colorado DMV Collaborations: • Temporary Permit (Plate) Redesign • Temporary Permit Data Entry • Vehicle Registration Hold Program • Equipment Enhancements: • OCR Retrain • Lane, RFID and Imagery • AAMVA Region IV Meeting Sponsor • Additional State DMV IGAs

  3. Leadership transition: Re-energize membership, business development and OmniAir certification efforts • Client Request for Republishing of OmniAir’s Electronic Payment Systems National Interoperability Specification • Several New OmniAir Memberships • Confer with USDOT and FHWA: Interoperability • OmniAir work for USDOT: Sustained Connected Vehicle Certification • New ISO 18000-6C Certifications

More Related