1 / 14

Preparation of Technical Study for the project “Motorway on the Corridor Vc” using Digital Elevation Model Sarajevo

Preparation of Technical Study for the project “Motorway on the Corridor Vc” using Digital Elevation Model Sarajevo, September 2005 IPSA INSTITUT Content: About IPSA Project “Motorway on the Corridor Vc” Digital topographic data provided by “ JICA Study Team ” Motorway location

albert
Download Presentation

Preparation of Technical Study for the project “Motorway on the Corridor Vc” using Digital Elevation Model Sarajevo

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Preparation of Technical Study for the project “Motorway on the Corridor Vc” using Digital Elevation ModelSarajevo, September 2005 IPSA INSTITUT

  2. Content: • About IPSA • Project “Motorway on the Corridor Vc” • Digital topographic data provided by “JICA Study Team” • Motorway location • Example for the longitudinal profile of terrain • 3D animation of the Motorway IPSA Institut Sarajevo

  3. About IPSA • IPSA Instituteis private independent consultant company founded in 1958 • Since its foundation in 1958, IPSA Institute has successfully carried out more than 7300 studies and designs • The scope of services include preparation of feasibility studies, research studies, designing and supervision for the works in the area of transport infrastructure, construction and water and energy supply IPSA Institut Sarajevo

  4. Motorway on the Corridor Vc • Motorway on the Corridor Vc Budapest-Osijek-Sarajevo-Ploce, through BiH, is the most important developmnet project for BiH • This Corridor is included in the European transport infrastructure network • Corridor Vc route, with length about 330 km, follows the direction north-south, through the area populated with more than 52% of the whole population IPSA Institut Sarajevo

  5. General layout of the Corriod V with three branches • Corridor Vc direction Budapest (Hungary)Osijek (Croatia) Sarajevo (B&H) Ploce Harbor (Croatia) IPSA Institut Sarajevo

  6. Motorway on the Corridor Vc • IPSA, together with other firms from Consortium, is preparing planning-study documentation which includes: *technical study *analitical-documentation basis *conceptual design *enviornment protection study *preliminary design *feasibility study IPSA Institut Sarajevo

  7. Digital topographic data provided by “JICA Study Team” • DEM (Digital Elevation Model) is used as the basis for preparation of Technical Study The DEM is developed from contour line data that were created by scanning and digitalizingthe existing 1:25000-scaletopographic maps by ArcInfo software • Contour line data from ArcInfo had to be converted into .dwg format to become usable for the softwares used in local firms IPSA Institut Sarajevo

  8. DEM for the study area IPSA Institut Sarajevo

  9. Motorway location • Entering terrain data from .dwg format • Drawing of the route and vertical alignment • Data processing in these softwares gives the longitudinal profiles of terrain IPSA Institut Sarajevo

  10. Longitudinal section - River Trebacka with bridges IPSA Institut Sarajevo

  11. Longitudinal section – tunnel Vijenac L=2964 m IPSA Institut Sarajevo

  12. 3D image for Motorway on the Corridor VC with the Ortho Photo and the Digital Topographic DATA IPSA Institut Sarajevo

  13. http://www.ipsa-institut.com IPSA Institut Sarajevo

  14. Thank you for your attention! IPSA Institut Sarajevo

More Related