1 / 3

BMGT 1306 EVALUATE A PROJECT / TUTORIALOUTLET DOT COM

The project includes repairing and replacing equipment as<br>necessary.

albert0051
Download Presentation

BMGT 1306 EVALUATE A PROJECT / TUTORIALOUTLET DOT COM

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. BMGT 1306 EVALUATE A PROJECT / TUTORIALOUTLET DOT COM

  2. BMGT 1306 EVALUATE A PROJECT / TUTORIALOUTLET DOT COM BMGT 1306 evaluate a project FOR MORE CLASSES VISIT www.tutorialoutlet.com The project includes repairing and replacing equipment as necessary. The apartment building is ten stories tall, has 100 apartment units, and is twenty-eight years old.Thegoal is to keep the building viable in the marketplace, expend the $400,000 and get the most benefit for the money from a maintenance and marketing stand-point. Inspection of the building exterior has indicated areas of loose mortar between some brick joints. The apartments are cooled by window air-conditioning units, and each apartment has two air-conditioning units. Half of the air-conditioning units were replaced twelve years ago. Bathrooms are showing their age. The bathrooms consist of combination tub and shower, vanity, mirror cabinet, and toilet. Heating is hydronic and is provided by a pair of fire tube boilers. Elevators are serviceable, but they are running slow and could benefit from a system upgrade. Each unit has six windows and they are serviceable, but they show signs of aging as well. There are twenty vacant apartments in the building. Other than replacement of one air conditioner in each, none has had any work done since the apartment was built. Carpeting is changed only when an apartment is vacant. Item Cost to upgrade

  3. BMGT 1306 EVALUATE A PROJECT / TUTORIALOUTLET DOT COM thank you

More Related