Utilities Committee City of Appleton Stormwater Management UpdatePresented to the April 23, 2013
Ongoing Projects CONSTRUCTION PROJECTS: • Reid Golf Course Ponds, Channel Modifications, and Bridges FLOOD STUDY PROJECTS: • CTH OO Basin • Manitowoc Road Study Area • West Wisconsin CAPITAL PROJECTS: • Douglas and Outagamie Streets (Spencer Locust Basin) • Ballard Road Urbanization/Lightning Drive Construction STORMWATER MANAGEMENT PLAN UPDATE GREEN TIER WATER RESOURCES SITE DEVELOPMENT STORMWATER REVIEWS
Reid Golf Course Ponds and Channel Modifications • Construction started back up this month • Begin work on East Pond
CTH OO Basin Study • Final memo delivered to City • Many ponding areas through basin; Limited flood reduction benefits without increasing flows downstream.
Manitowoc Road Study • Final memo delivered to City. • Several ponding areas through basin; limited flood reduction benefits without increasing flows downstream or removing existing development. • Will continue discussions with WisDOT on potential cost-share opportunities.
West Wisconsin Study • Evaluating options including relief sewer, underground storage, and above ground storage.
Douglas and Outagamie Design Assistance • Final memo delivered to City • Alternative 3A selected – reduces flooding throughout system
Ballard Road Urbanization and Lightning Drive Alignment Evaluation • Final memo delivered to City. • Provides options for compliance with water quality and quantity requirements when roads are urbanized/built. • Also addresses floodplain issues.
Stormwater Management Plan Update • Continuing to interact with WDNR on TMDL implementation and modeling for compliance with Waste Load Allocations. • Waiting for further direction from WDNR for comparison with TMDL numbers.
Green Tier Water Resources • Developed preliminary project list with City for pilot projects to implement under Green Tier program with WDNR • Water Resources Plan not needed at this time.
Stormwater Reviews – New and Redevelopment • Kwik Trip • Evergreen Commons • Dollar Tree • RiverHeath • St Elizabeth’s Hospital BedTower