An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Stormwater Management Jamie Geils Lock, Project Engineer DuPage County Stormwater Management

  2. Floodplains by Design (video) Floodplains By Design

  3. Important Ideas • During severe floods, floodwaters rise beyond banks and can reach the upper part of the floodplain. • Communities often grow within floodplains. • Structures such as dams, reservoirs and levees protect communities from flooding. • During severe floods, water can overtop these structures. • Restoring floodplain to a natural state, such as wetlands, may help to alleviate flooding. • Flexibility is important to flood management to operate according to severity of flood.

  4. Problem • A number of factors can contribute to flooding, including: • Heavy Rain • Snowmelt • Impervious Surfaces • Upstream Conditions • Certain areas are more susceptible: • Highly Developed Areas • Cities • Suburbs • Floodplains

  5. Tools • Watershed Planning • Flood Control Structures • Dams • Levees • Reservoirs • Green Infrastructure • Wetlands • Green Roofs • Rain Gardens • Bioswales • Rainwater Harvesting Systems • And Much More!

  6. Example • Bower Elementary School • Incurred approximately $1.7 million in damages from a flood event in 2008. • Was forced to close for 1 week. • Unable to use half of the building for 6 months. • Why did this happen? • Built in floodplain. • Existing berm (levee) along West Branch DuPage River settled over the years and could not contain floodwater.

  7. Possible Solutions • Build a dam upstream to prevent water from coming downstream. • Tear down school and restore floodplain. • Enhance existing berm. • Install green infrastructure to soak up water. • Build a reservoir next to school. • Elevate school to bring usable area out of floodplain.

  8. What Solution Did We Use? • Enhanced Existing Berm • Most cost effective solution. • Built extra storage for floodwater downstream. • Did not adversely affect other properties. • Built pump to drain rainwater trapped on opposite side of berm. • Did it work? • In April 2013, Bower Elementary did not flood despite river elevations 9 ft. above normal.

  9. Bower Elementary School

  10. Thank You Jamie Geils Lock, P.E., CFM DuPage County Stormwater Management jamie.lock@dupageco.org 630.407.6705