Task Group Process Overview. Authors:. Date: 2008-11-12. Abstract. An overview of the typical task group process as it relates to TGac. Overview of Task Group Steps. Form Study Group (SG) Study (is the task feasible?) Construct PAR Form Task Group (TG) Staff the task group Chair
E N D
Task Group Process Overview Authors: Date: 2008-11-12 Darwin Engwer, Nortel Networks
Abstract An overview of the typical task group process as it relates to TGac. Darwin Engwer, Nortel Networks
Overview of Task Group Steps • Form Study Group (SG) • Study (is the task feasible?) • Construct PAR • Form Task Group (TG) • Staff the task group • Chair • Secretary • Leaders for the 4 controlling docs • Prepare controlling docs • Issue RFP • Hear proposals • Select from amongst proposals • Internal review of draft (letter ballot) • Incremental revisions(1) - as challenges/ opportunities are uncovered • External review of draft (sponsor ballot) • Incremental revisions(2)? - as challenges/ opportunities are uncovered • Publish draft as an 802.11 amendment Darwin Engwer, Nortel Networks
Controlling Documents (envisioned) • Functional requirements • Channel models • Comparison criteria • Selection procedure • Recommend prioritizing that list (in the order shown) • Although some can be done in parallel • Preferred completion order is as shown Darwin Engwer, Nortel Networks
Other Considerations • Discuss/ agree upon TG working process. • When issue CFP? • Identify work areas that can be developed in conjunction with VHT60: • MAC functions, e.g. “session mgmt” • Space-time channel management Darwin Engwer, Nortel Networks