An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SCM Metrics Draw the Process

  2. SCM Metrics

  3. SCM Metrics Collect the Data

  4. SCM Metrics CM Audits

  5. SCM Metrics Provide the METRICS “Without the Data…. You are just an Opinion”

  6. SCM Metrics R3B3 Mean (as of 26 Feb 01) 14 Workdays R3B2Mean 65 Workdays Areas of Improvement • SCM Procedures re-written to clarify process. • SCM Process identified and defined. • SCM Communications with Engineering Community Increased. Red = Unacceptable Yellow = Marginal Green = Goal = Actual = Estimate/Goal

  7. Green = Actual Blue = Expected SCM Metrics

  8. SCM Metrics Release 3 Build 3 I&T SCCB Number of Issues (Issue Status)

  9. SCM Metrics Release 3 Build 3 I&T SCCB Number of Issues (Issue Status by Severity)

  10. SCM Metrics Average Days To Closure Overall Timeframe for Issues (Open to Closure Status – By Release & Build)

  11. SCM Metrics Release 3 Build 3 I&T SCCB Average Days To Closure Timeframe for Issues (By Priority Status)

  12. R3B5 Baseline Progress Blue: SCM Baseline Completed. Green: Development Activities In-Progress Integ. & Test (Completion Date: Nov 01) Software Development (Planned Completion Date: Sept 01) DD CUT CSCI Imp. Detailed Design Walkthrough Activities 83% Complete Code & Unit Test Walkthrough Activities 58% Complete CSCI Implementation Walkthrough Activities 33%Complete

  13. SCM Metrics Audit Findings Number of Occurances (Problem Areas)

  14. CONCLUSION • Effective Configuration Management is critical to the success of the Program. SCM is critical to: • Successful software development and the preservation of SW technical artifacts & baselines. • Achieving SEI-CMM L3 and beyond.