1 / 5

Citrus Workshop Letsitele 10 March 2011

Citrus Workshop Letsitele 10 March 2011. TFR Container & Automotive Business. Influential factors determining the success of the operation. The plan for the 2011 citrus season. 0. TZANEEN – DURBAN (SMLJ’s) FRUIT TRAIN PERFORMANCE. Week 23 - 30 (07 June – 02 August 2010). Actual. Actual.

alena
Download Presentation

Citrus Workshop Letsitele 10 March 2011

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Citrus WorkshopLetsitele10 March 2011 TFR Container & Automotive Business

  2. Influential factors determining the success of the operation www.transnet.net

  3. The plan for the 2011 citrus season www.transnet.net

  4. 0 TZANEEN – DURBAN (SMLJ’s) FRUIT TRAIN PERFORMANCE Week 23 - 30 (07 June – 02 August 2010) Actual Actual Target Target Total volume (TEU) • ~500 TEUs Loaded, • ~574 TEUs Empties have been railed. • Citrus Train for week 30 went via Cape Town • Empty Throughput Time within Target, except Week 25 • The trains have all met stack (100% adherence each week) Key observations Loaded Throughput (hrs) 72 Empty Throughput (hrs) 72 Stack adherence (%) 100 23 24 25 26 27 28 29 30 Week www.transnet.net 4 Source: CABU Customer Care

  5. Thank You www.transnet.net

More Related