An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. FREQUENCY SPECTRUM FOR 2005-06 Low Frequency Operation High Frequency Operation

  2. FREQUENCY SPECTRUM FROM APRIL 06 TO OCT 06 (UPTO 20TH OCT 06) Low Frequency Operation High Frequency Operation

  3. POWER SUPPLY POSITIONFOR 2005-06 & 2004-05 MAXIMUM DEMAND MET: STATE WISE MAXIMUM DEMAND MET:

  4. POWER SUPPLY POSITIONFOR THE PERIOD FROM APRIL TO SEPTEMBER Current Year : 2006 Last Year : 2005 MAXIMUM DEMAND MET: STATE WISE MAXIMUM DEMAND MET:

  5. TYPICAL DAY UI IMPORT FROM CENTRAL GRID2nd SEP 2006 Maximum of 1550MW Imported 3.97 Crores Saved on Inter-Regional Differential Frequency.

  6. TYPICAL DAY UI EXPORT TO CENTRAL GRID2ND JULY 2006 Maximum of 900MW Exported 68 Lakhs Saved on Inter-Regional Differential Frequency.

  7. RESERVOIR LEVEL - COMPARISON

  8. TALCHER-KOLAR IMPORT OF 34,521MUs FROM ER THROUGH TALCHER-KOLAR UPTO SEP – 06

  9. KADAMPARAI GENERATION/PUMP ENERGY FROM JAN - 2003

  10. SRISAILAM LB GENERATION/PUMP ENERGY FROM APRIL - 2005

  11. UI IN SR (FROM 01/01/03 TO 08/10/06) • TOTAL UI TURNOVER :- 12,153 MU • TOTAL UI AMOUNT DISBURSED:- 2,503 CR • AVG WEEKLY TRANSACTION:- 62 MU • AVG WEEKLY UI AMOUNT DISBURSED:- 13 CR

  12. SUMMARY OF UI – 197 WKS(FROM 01/JAN/03 TO 08/OCT/06)

  13. IR EXCHANGES OF SR IN THE FORM OF UI TILL 08.10.2006 (197 WEEK)

  14. SUMMARY OF UI – 27 WKS(FROM 03/APR/06 TO 08/OCT/06) ANDHRA PRADESH KARNATAKA

  15. SUMMARY OF UI – 27 WKS(FROM 03/APR/06 TO 08/OCT/06)

  16. SUMMARY OF UI – 27 WKS(FROM 03/APR/06 TO 08/OCT/06)

  17. UI EXCHANGES AND AVG. RATES IN RESPECT OF DIFFERENT CONSTITUENTS IN SR FOR THE PERIOD FROM 03/APR/06 TO 08/OCT/06 621MU 191MU 2659MU 29MU 258MU 1337MU 90MU 204MU KAR KER TN PON AP 23MU 145MU 153MU 88MU

  18. LOAD FACTOR OF NLC & NPC 2005 - 06 2006 - 07 (Upto Sep-06)

  19. STOA Import/Export/Wheeled Energy 2005 – 06 2006 – 07 (Upto Sep-06) All figures in MUs