1 / 28

FREQUENCY SPECTRUM FOR 2005-06

FREQUENCY SPECTRUM FOR 2005-06. Low Frequency Operation. High Frequency Operation. FREQUENCY SPECTRUM FROM APRIL 06 TO OCT 06 (UPTO 20 TH OCT 06). Low Frequency Operation. High Frequency Operation. FREQUENCY SPECTRUM FROM OCT 06 TO FEB 07 (UPTO 12 TH FEB 07). Low Frequency Operation.

emery-marsh
Download Presentation

FREQUENCY SPECTRUM FOR 2005-06

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. FREQUENCY SPECTRUM FOR 2005-06 Low Frequency Operation High Frequency Operation

  2. FREQUENCY SPECTRUM FROM APRIL 06 TO OCT 06 (UPTO 20TH OCT 06) Low Frequency Operation High Frequency Operation

  3. FREQUENCY SPECTRUM FROM OCT 06 TO FEB 07 (UPTO 12TH FEB 07) Low Frequency Operation High Frequency Operation

  4. POWER SUPPLY POSITIONFOR 2006-07, 2005-06 & 2004-05 MAXIMUM DEMAND MET: STATE WISE MAXIMUM DEMAND MET:

  5. POWER SUPPLY POSITIONFOR THE PERIOD FROM OCT 06 TO FEB 07 Current Year : 2006 - 07 Last Year : 2005 - 06 MAXIMUM DEMAND MET: STATE WISE MAXIMUM DEMAND MET:

  6. TYPICAL DAY UI IMPORT FROM CENTRAL GRID23rd OCT 2006 Maximum of 560MW Imported

  7. TYPICAL DAY UI IMPORT FROM CENTRAL GRID24th OCT 2006 Maximum of 730MW Imported

  8. TYPICAL DAY UI IMPORT FROM CENTRAL GRID4th FEB 2007 Maximum of 820MW Imported

  9. TYPICAL DAY UI EXPORT TO CENTRAL GRID4th NOV 2006 Maximum of 470MW Exported

  10. AP UI, TN UI & KADAMPARAI GENERATION Vs FREQ FOR 20-OCT-06

  11. RESERVOIR LEVEL - COMPARISON

  12. GAZUWAKA HVDC

  13. BHADRAWATI HVDC

  14. TALCHER-KOLAR HVDC

  15. KADAMPARAI GENERATION/PUMP ENERGY FROM JAN - 2003

  16. SRISAILAM LB GENERATION/PUMP ENERGY FROM APRIL - 2005

  17. UI IN SR (FROM 01/01/03 TO 04/02/07) • TOTAL UI TURNOVER :- 13,051 MU • TOTAL UI AMOUNT DISBURSED:- 2,839 CR • AVG WEEKLY TRANSACTION:- 61 MU • AVG WEEKLY UI AMOUNT DISBURSED:- 13 CR

  18. SUMMARY OF UI – 214 WKS(FROM 01/JAN/03 TO 04/FEB/07)

  19. IR EXCHANGES OF SR IN THE FORM OF UI TILL 04.02.2007 (214 WEEK)

  20. IR EXCHANGES OF SR IN THE FORM OF UI FROM 03.04.2006 TO 04.02.2007 (44 WEEK)

  21. IR EXCHANGES OF SR IN THE FORM OF UI FROM 02.10.2006 TO 04.02.2007 (18 WEEK)

  22. SUMMARY OF UI – 44 WKS(FROM 03/APR/06 TO 04/FEB/07) ANDHRA PRADESH KARNATAKA KERALA TAMIL NADU

  23. SUMMARY OF UI – 18 WKS(FROM 02/OCT/06 TO 04/FEB/07)

  24. SUMMARY OF UI – 18 WKS(FROM 02/OCT/06 TO 04/FEB/07)

  25. SUMMARY OF UI – 18 WKS(FROM 02/OCT/06 TO 04/FEB/07)

  26. UI EXCHANGES AND AVG. RATES IN RESPECT OF DIFFERENT CONSTITUENTS IN SR FOR THE PERIOD FROM 02/OCT/06 TO 04/FEB/07 507MU 322MU 2659MU 14MU 61MU 1337MU 19MU 24MU KAR KER TN PON AP 38MU 30MU 328MU 168MU

  27. LOAD FACTOR OF NLC & NPC 2005 - 06 2006 - 07 (Upto Jan-07)

  28. STOA Import/Export/Wheeled Energy 2005 – 06 2006 – 07 (Upto Sep-06) IS IT ONLY WRT IR EXCHANGES NOTE :UPDATE All figures in MUs

More Related