Forecasting Uncertainty Related to Ramps of Wind Power Production

Forecasting Uncertainty Related to Ramps of Wind Power Production. European Wind Energy Conference, Warsaw, 20-23 April 2010. Arthur Bossavy , Robin Girard, Georges Kariniotakis Center for Energy and Processes MINES- ParisTech /ARMINES. Introduction.

aletha
Download Presentation

Forecasting Uncertainty Related to Ramps of Wind Power Production

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Forecasting Uncertainty Related to Ramps of Wind Power Production European Wind Energy Conference, Warsaw, 20-23 April 2010 Arthur Bossavy, Robin Girard,Georges Kariniotakis Center for Energy and Processes MINES-ParisTech/ARMINES

  2. Introduction • Need to improvewind power forecastingwith focus on extremesituations • Various temporal/spacescales • Focus on uncertainty and weatherpredictability • Distribution tailevents • To contribute to • An increased and more securewindintegration to power grid • Lowercosts (i.e: reducedimbalances) • …

  3. Introduction A problem with usual wind power forecasts Centeredpredictionintervals of coverage: predictions observations

  4. Objectives of the work 1. Improve the reliability of usual confidence intervals w.r.trampevents 2. Forecast confidence intervals to estimate the uncertainty of ramps timing

  5. Outline • A methodology for rampsdetection • A probabilistic model usingramps information • Forecast of ramps timing using ensembles

  6. Detection of ramps FILTERING THRESHOLDING Ramp detected intensity Threshold timing

  7. Detection of ramps • Evolution of the rampintensitythroughDenmark

  8. Outline • A methodology for rampsdetection • A probabilistic model usingramps information • Forecast of ramps timing using ensembles

  9. A probabilistic model using ramps information Objective: Produce more reliableprobabilisticforecasts by using information on forthcomingramps

  10. Production of spot forecasts Ramps detection 3-stage forecasting process using ramps information Probabilistic processing Spot forecasting model SCADA NWP INTENSITY SCADA TIMING NWP spot Filtering • Ramps • TIMING • INTENSITY forecasts Thresholding Probabilistic forecasting model Ramps Information

  11. Case-studies • 1 windfarm in Ireland, 1 in Denmark • 18 months of data (02/01-08/02 and 01/03-07/04) • Hourly power measures • Hourlywind speed/direction NWP forecasts (10m height). • Probabilistic model based on the Quantile RegressionForestsprocedure

  12. Evaluation measures Reliability: Sharpness:

  13. Results Wind farm in Denmark Wind farm in Ireland • Forecastsunderestimate quantiles • Reliabilityimproved for highest quantile forecasts • Sharpnessremainsunchanged

  14. Results • Estimation of the uncertaintymaybeimprovedatramps • Need of more tests: other quantile estimation methods

  15. Outline • A methodology for rampsdetection • A probabilistic model usingramps information • Forecast of ramps timing using ensembles

  16. Forecast of ramps timing using ensembles Objective: Aggregateramps information provided by members of a wind power forecasts ensemble

  17. Forecast of ramps timing using ensembles Filteringmembers of a forecasts ensemble More than 35 over 51 memberspredictingthisramp h1 h2 h3

  18. Forecastramps timing using ensembles Proposal for a probabilisticforecast of ramps timing • Mean value for the ramp timing: • Confidence intervals:

  19. Case-studies and evaluationresults • Case-studies: 3 wind farms in France • Wind speed forecasts ensemble (51 members from the EPS system of ECMWF) • Random Forest procedure • Evaluation of forecast probabilities: Brier Score: Brier Skill Score w.r.tClimatology:

  20. Visualization of confidence intervals 70% 57% 39% 65% • 39 memberspredicting the • increasingramp • 15 memberspredicting the • decreasingramp 43% 28%

  21. Conclusions • The probabilistic model usingramps information maybevaluablewhenestimating the highest quantiles • The approachbased on ensembles provide confidence intervals to forecastramp occurrence. Reliabilityw.r.tClimatologyisimproved Need of more experiments

  22. Acknowledgments • Project SAFEWIND: « Multi-scale data assimilation, advanced wind modelling and forecasting with emphasis to extreme weather situations for a safe large-scale wind power integration » • Industrial partners of the project for providing data

  23. Thank you for your attention! 29