1 / 13

GPS & VLBI Meteorology over Northeast Brazil: Perspectives

GPS & VLBI Meteorology over Northeast Brazil: Perspectives. Alexandre A. Costa (*), A. M. P. de Lucena, P.Kaufmann, F. S. A. Cavalcante, F. G. M. Pinheiro, F. A. T. F. da Silva, J. B. V. Leal Jr., V. P. Silva-Filho (*) Head, Meteorology Department, FUNCEME and

alice
Download Presentation

GPS & VLBI Meteorology over Northeast Brazil: Perspectives

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. GPS & VLBI Meteorology over Northeast Brazil: Perspectives Alexandre A. Costa (*), A. M. P. de Lucena, P.Kaufmann, F. S. A. Cavalcante, F. G. M. Pinheiro, F. A. T. F. da Silva, J. B. V. Leal Jr., V. P. Silva-Filho (*) Head, Meteorology Department, FUNCEME and Professor, Applied Physical Sciences Graduate Program, UECE

  2. Eusébio Station • Radio-observatory linked to INPE • Prospectives of cooperative agreement with FUNCEME and UECE (focus on meteorology and atmospheric physics).

  3. Role of the Tropics...

  4. Every year... ... ITCZ visits Northeast Brazil: March-April

  5. UECE’s Graduate Program • Applied Physical Sciences (started working on “Meteorology and Energy” as its major research line): 16 students in March-06. • Atmospheric Physics Group: 4 Ph.D.’s, 2 M.Sc., graduate and undergraduate students

  6. UECE’s Research Infrastructure • Instrumented Aircraft

  7. FSSP and Csiro-King OAP 200X and 200Y Data Acquisition System Global Positioning System Meteorological instrumentation CCN counter

  8. FUNCEME: 30 years of Operational Meteorology • Department of Meteorology and Oceanography: 4 Ph.D. (2 more being hired), 5 M.Sc. (2 more being hired) • Infrastructure: Satellite images (NOAA, Meteosat, MSG being installed), Doppler radar (at UECE campus), 70 automatic surface stations, about 600 raingauges, 30-processor, 7 TB PC Cluster, PIRATA office

  9. Observational Network meteorological satellites Meteorological Radar Oceanographic Buoy PIRATA Project DCP´s Network Conventional Rain Gage Network

  10. PC cluster for climate simulations(funding for a second cluster for weather/wind energy prediction was aproved)

  11. EXIMIA:EXperimento Integrado de MeteorologIA(Integrated Meteorological Experiment) 2005 – Initial Planning 2006 – Final Planning and Funding submission 2007 – Preparation, Training 2007-2008 – Field Campaigns (dry season and wet season) After that: Data analysis...

  12. EXIMIA components • EMAS-2 (Experimento de Mesoescala na Atmosfera do Sertão, Mesoscale Experiment in the Dry Land Atmosphere) • EMfiN! (Experimento de Microfísica de Nuvens, Cloud Microphysics Experiment) • Micrometeorological measurements • Surface meteorological observations • Radiation observations • Calibration of radar, satellite and GPS-VLBI retrievals for the tropical region

  13. In Place of Conclusions • Nice combination of infrastructure in meteorology and atmospheric physics, personnel, operation and education+research potential • Interest of cooperating with VLBI-GPS community as “end” user (the end is actually in the society) • Hope to show results next time...

More Related