180 likes | 444 Views
VDC Certification Program BIM+ Group. Magne Ganz Tero Lilja Magnus Osbäck Mads Hermann Mette Mikkelsen. What is BIM?. 4 D. BIM+ in NCC. Coordination. Description. Site planning. Land purchasing. Concept development. Communication. QTO. Design Review. Acoustics simulation.
E N D
VDC Certification ProgramBIM+ Group Magne Ganz Tero Lilja Magnus Osbäck Mads Hermann Mette Mikkelsen zcCompany
What is BIM? zcCompany
4 D BIM+ in NCC Coordination Description Site planning Land purchasing Concept development Communication QTO Design Review Acoustics simulation Fire simulation Structure Webhotel Sun and shadow Budget Model check zcCompany
BIM+ in NCC One of the strongest things about using BIM is the ability to visualize and analyze the project, which makes a better collaboration between all involved people on a project.
Visualization The model gives a quick and more precise picture of the project, no matter which part of the building you are designing or which disciplines you cover. The model is used as a visual supplement to the traditional 2D drawings.
Visualization The model is used to show how the building process is planed. It is used in design and production meetings but also in communicating with the owner and the people living in the area around the construction site.
Visualization The model is used to show how the building process is planed. It is used in design and production meetings but also in communicating with the owner and the people living in the area around the construction site.
Visualization The model is used to show how the building process is planed. It is used in design and production meetings but also in communicating with the owner and the people living in the area around the construction site.
Analyzing The design manager can follow the stage of the project by using the 3D model.It gives you a quick overview of where the next focus areas should be for the consultants.
Analyzing The project can be divided into several parts, so it is very important to focus on the interface between the different elements in these parts. By combining all models you can visualize the challenges and solutions in between the interfaces.
Collaboration The models are checked and analyzed together and a report is used as documentation for clashes and other issues in the project. These reports is distributed to all involved participants.
Collaboration Complicated areas can be coordinated by using the model. The design group can also coordinate the delivery plan and visualize the production of specific solutions.
Common Challenges today • The BIM is not used to its full potential. • Model quality is varying • Lot of time spent on clarifying and coordinating the level of geometry and information • We need more trained personnel on each project that can do the BIM-coordination • Not good enough Mobile IT solutions that supports BIM • The BIM lifecycle is hard to fulfill with out central data storage. Files are stored in different locations and in different versions • Lack of real-time connection to cost/time analysis zcCompany
How can VDC help us getting better? • NCC should coordinate the model and facilitate the Process • Strengthen the collaboration, by using ICE session includingco-location and BIM+ • Common BIM requirements and templates • Standard automated quality checking routines • Implement best practice in BIM • More training of personnel in Projects and spot the talented people • Integrated model and data management system zcCompany
How can VDC help us getting better? • Use Metrics to analyze success Projects and what caused the success • Discover critical changes in the design phase • Improving the model coordination by using Metrics • Metrics can locate new NCC focus areas, by exposing the weaknesses in the BIM process zcCompany
Goal 4D Time/scheduling 6D Sustainability 3D Model 5D Calculation 2D Drawings 7D FM The fully coordinated model Risk management Happy Owner Better Communication Better Workflow Safety zcCompany
Goal 4D Time/scheduling 6D Substainability 3D Model 5D Calculation 2D Drawings 7D FM Better Project With fully coordinated model Risc management Happy Owner Better Communication Better Workflow Safety zcCompany