PLTU TANJUNG SELOR 2 X 7 MW

PLTU TANJUNG SELOR 2 X 7 MW. SITE SELECTION 29 Maret - 2 April 2010. Alternative Lokasi PLTU. Alt 3. Alt 2. Alt 1. Alt 4. Summary of site selection. Berdasarkan analisa visual dan pembobotan maka lokasi PLTU Tanjung Selor adalah: Alternative-4. Peta GPS. Foto (Alt.1). Foto (Alt.2).

almira
Download Presentation

PLTU TANJUNG SELOR 2 X 7 MW

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PLTU TANJUNG SELOR2 X 7 MW SITE SELECTION 29 Maret - 2 April 2010

  2. Alternative Lokasi PLTU Alt 3 Alt 2 Alt 1 Alt 4

  3. Summary of site selection Berdasarkan analisa visual dan pembobotan maka lokasi PLTU Tanjung Selor adalah: Alternative-4

  4. Peta GPS

  5. Foto (Alt.1)

  6. Foto (Alt.2)

  7. Foto (Alt-3)

  8. Foto (Alt-4)