PLTU 2 x 3 MW NIAS SELATAN. SITE SELECTION with PLN CABANG NIAS and PLN Enjiniring 1 6 -2 0 March 2010. Peta GPS PULAU NIAS. LOKASI IPP PLTU NIAS 2x7 MW. FOTO LOKASI IPP PLTU NIAS 2x7 MW GUNUNG SITOLI UTARA. LOKASI 1 PLTU NIAS SELATAN 2x3 MW. LOKASI 2
E N D
PLTU 2 x 3 MWNIAS SELATAN SITE SELECTIONwith PLN CABANG NIAS and PLN Enjiniring 16-20 March 2010
LOKASI IPP PLTU NIAS 2x7 MW
LOKASI 1 PLTU NIAS SELATAN 2x3 MW LOKASI 2 PLTU NIAS SELATAN 2x3 MW
LOKASI 3 PLTU NIAS SELATAN 2x3 MW LOKASI ALT 1 PLTU NIAS SELATAN 2x3 MW
FOTO LOKASI 3 DAN ALT - 1DESA BALOHO LOKASI 3 PLTU NIAS SELATAN 2x3 MW LOKASI ALT - 1 PLTU NIAS SELATAN 2x3 MW
LOKASI ALT 2 PLTU NIAS SELATAN 2x3 MW
LOKASI ALT 3 PLTU NIAS SELATAN 2x3 MW
RencanaLokasi PLTU • DIUSULKAN OLEH PLN WILAYAH SUMUT • LOKASI DI GUNUNG SITOLI UTARA UNTUK RENCANA IPP; PLTU NIAS 2x7 MW • LOKASI 1,2 DAN 3 UNTUK PLTU NIAS SELATAN 2x3 MW
RencanaLokasiAlternatif PLTU DI SURVEY OLEH PLN CABANG NIAS DAN PLN E UNTUK RENCANA PLTU NIAS SELATAN 2x3 MW
diskusi • DARI EMPAT (4) LOKASI YANG DIUSULKAN OLEH PLN WILAYAH SUMUT, PADA DI DESA AFIA, KECAMATAN GUNUNG SITOLI UTARA, AKAN DIPERGUNAKAN UNTUK IPP PLTU NIAS 2x7 MW. • UNTUK PLTU NIAS SELATAN 2x3 MW, BERDASARKAN PEMBOBOTAN, LOKASI 3 (DESA BALOHO, KECAMATAN TELUK DALAM) LEBIH LAYAK DIBANDINGKAN LOKASI 1 DAN 2, AKAN TETAPI SECARA VISUAL, KONDISI LAUT DI LOKASI 3 TERDAPAT BARRIER TERUMBU KARANG (± 500 M DARI GARIS PANTAI), YANG DIKHAWATIRKAN DAPAT MENGHAMBAT AKSES COAL BARGE, SEHINGGA PLN-E BERINISIATIF UNTUK MENCARI LOKASI ALTERNATIF DI SEKITAR LOKASI 4. • DARI HASIL SURVEY DIPEROLEH LOKASI ATERNATIF 1 (± 1.5 KM DARI LOKASI 3) YANG SECARA VISUAL KEBERADAAN TERUMBU KARANG LEBIH SEDIKIT DIBANDINGKAN LOKASI 3. • DARI PENJELASAN DIATAS DAPAT DISIMPULKAN BAHWA UNTUK PLTU NIAS SELATAN 2x3 MW, LOKASI ALTERNATIF 1 LEBIH LAYAK DIBANDINGKAN LOKASI 3 MESKIPUN SECARA PEMBOBOTAN LOKASI ATERNATIF 1 (136.92) LEBIH SEDIKIT DIBANDINGKAN LOKASI 3 (137.12).
diskusi • PADA SITE SURVEY KALI INI PLN-E JUGA MENDAPAT MASUKAN DARI PLN CABANG NIAS UNTUK MENCARI ALTERNATIF LOKASI PLTU DENGAN MEMPERTIMBANGAN BEBAN PENDISTRIBUSIAN KEBUTUHAN LISTRIK DI PULAU NIAS, DENGAN HARAPAN LOKASI PLTU NIAS SELATAN 2x3 MW DAPAT DIPINDAHKAN KE LOKASI TERSEBUT, SEHINGGA DIPEROLEH LOKASI ALTERNATIF 2 DAN 3. • SECARA VISUAL DAN PEMBOBOTAN, LOKASI ALTERNATIF 2 (DESA SIMANERE, KECAMATAN GUNUNG SITOLI IDANOI) LEBIH LAYAK UNTUK LOKASI PLTU NIAS SELATAN 2x3 MW.
INFORMASI UMUMPltu 2x3 MW • PRAKIRAAN TOTAL KEBUTUHAN AIR PLTU • AIR PENDINGIN = 1.200 m3/hari • AIR DEMIN & SERVICE = 20m3/hari • PRAKIRAAN TOTAL KEBUTUHAN BATUBARA SELAMA 1 HARI = 120 Ton SELAMA 1 BULAN = 3600 Ton PRAKIRAAN KEBUTUHAN LAHAN UNTUK COAL YARD AKTIVE STORAGE SELAMA 10 HARI = 0,07 Ha DEAD STORAGE SELAMA 1 BULAN = 0,02 Ha • PRAKIRAAN ABU YANG DIHASILKAN SELAMA 1 TAHUN = 2.500,00 Ton LUAS LAHAN YANG DISEDIAKAN = 0,04 Ha
KONDISI PEMBANGKIT MARET 2010PLTD GUNUNGSITOLI Catatan : DGS-7 & DGS-8 sudah di usulkan menjadi material ATTB rusak karena gempa Nyalakan Irit Awasi Selebihnya
KONDISI PEMBANGKIT MARET 2010PLTD TELUK DALAM Nyalakan Irit Awasi Selebihnya
KONDISI PEMBANGKIT MARET 2010PLTD PULAU TELLO Nyalakan Irit Awasi Selebihnya
KONDISI UNIT SEWA 3MW - 5MWPLTD GUNUNGSITOLI DAN PLTD TELUK DALAM