An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Team Structure

  2. Project Schedule

  3. High Voltage System • High Voltage System split into two major subsystems: • Tractive System: • 75 kW nominal power output • 84 kW peak power output • Safety and Shutdown System: • Monitors vehicle for possible faults from Ground Fault, Battery Management and others • If a problem is detected will disengage the Tractive System until operator action is taken • Completely removes positive and negative terminals from Tractive System in less than 15mS • Drops voltage of Tractive System to under 40V in less than 1s

  4. Level 2 – Block Diagram of Shutdown Circuit

  5. Pre-Charge Circuit Level 2 – Schematic

  6. Discharge Circuit Level 2 – Block Diagram

  7. High Voltage System – Test Procedure • Assemble battery packs • Test Shutdown circuit • Connect contactors and test clearing faults, buttons properly control contactors. • Test Discharge circuit • Connect circuit to contactors. • When DC- is off resistance between DC+ and DC- should be 2k. • When DC+ is on resistance should be open. • Connect Motor controller LV systems • Test basic motor controller operation • Connect DC- to motor controller. • Connect 3Phase lines to motor. • Connect resolver interface. • Connect to CAN bus. • CAN I/O determines operation.

  8. High Voltage System – Test Procedure (cont) • Test Pre-charge circuit • Connect to battery side of DC+ • Connect relay to controller interface. • Connect pre-charge output to motor controller DC+ • Test Operation • If Pre-charge High turns off and DC+ turns on operation is OK • Calibrate motor controller resolver interface. • Follow RMS manual. • Connect DC+ to motor controller. • Power Unit on. • Test CAN control • If motor moves test is success.

  9. High Voltage System – Risk Mitigation • Shock hazard • Rubber lined leather gloves used to handle HV energized components • Indicators when system is energized external of battery boxes • Runaway car hazard • Multiple ‘on’ indicators as well as multiple emergency shutdown systems

  10. Other Risk mitigation available: • Failure Mode Effects Analysis (106 various failures and corrective actions taken by team)

  11. Other Risk mitigation available: • Electrical Safety Form • 90 Pages, 10,948 Words (Revision 5) • Details every electrical component and system used in the car.

  12. Accumulation System • Total 6.8 kWh capacity. • Total of 288 cells • Nominal voltage of 266.4, with a max of 302.4 VDC.

  13. BMS Configuration

  14. LiPo Cells - Risk Mitigation • If exposed to a fire, added mechanical shocks, decomposed, added electric stress by miss-use. The cell case will be breached at the extreme, and hazardous materials may be released. • Extinguishing Media: Water, carbon dioxide gas, chemical power fire extinguishing medium and fire foam. • Conditions to avoid: When a cell is exposed to an external short-circuit, crushes, deformation, high temperature above 100 degree C, direct sunlight and high humidity. • We plan to do testing, on spare cells at just above our operating specifications (a.k.a destructive testing)

  15. Battery Packs - Update • Being assembled now, using custom Kevlar boxes. • The tabs of each cell are extremely strong, and made out of aluminum. Each tab which will have a ¼ inch hole that will allow copper busbars to be attached • Copper busbars (sized to handle in excess of 400A) • Kevlar Insulating Cover (Surface Resistivity of 10^12-10^14 Ohms • Series connections between packs will be made by Anderson connectors (350 A).

  16. Accumulator Testing with BMS • As mentioned, each cell is numbered. This will allow us to pull data from the BMS and know exactly which cell is at what voltage and temp. • Connect all battery packs together and verify total voltage. We will then charge the accumulator to its maximum voltage of 302 VDC. • Once they are charged, discharge bench testing using Motor Controller and Motors. • The BMS will keep track of all voltages and temperatures over time. Repeat this process until we have enough data to accurately model the batteries as a whole unit. Develop discharge and charging curves for normal operations. • Using this data, improve the system for next year.

  17. Battery Packs - Risk Mitigation • Packs will be built cell by cell, one person may only build one pack at a time. All cells are numbered for inventory, tracking, and testing purposes. • Once a pack is complete, individual cells will be tested for correct voltage, and good electrical/mechanical contacts. Entire pack voltage will be confirmed. • Repeat the process nine times.

  18. Control System • Control of the car is a closed loop system in which throttle input from the drive is modified by various environmental factors to optimize desired outcome • So far: • All Low voltage parts, connectors and wiring resources have been selected and received. • Plans have been made with Mechanical Engineers to incorporate sensors into the car. • Wiring harness and low voltage boxes have been designed and construction is underway. • Next: • Finish construction of harness and boxes. • Preform out of car testing. • Mount systems in car and preform final continuity tests.

  19. Control System - Block Diagram

  20. Control System – Test Procedure • Each individual wired connection will be multimeter tested to ensure viability. • Mechanical strength of crimped connections will be tested. • Current draw on each fuse will be measured with a multimeter so that fused lines can be combined appropriately. • Time allowing, current draw of all lines will be tested to determine whether a smaller gauge of wiring would be possible. • Control system software will be verified using potentiometers as stand-ins for sensors.

  21. Control System – Risk Mitigation • Modular system allows individual sections of harness or LV boxes to be removed, tested and replaced if necessary. • Fallback system with single arduino connected directly to throttle and brakes will kick in if the sensor grid or control software fails. • Incorporating resistors into sensor power lines should prevent single sensor failure from shorting other sensors on the same fuse. • Debug panel with status indicators and interfaces for all controllers should allow quick identification of problems. • Safety features such as tractive system active light and ready to drive sound to help prevent accidents when working on the car.

  22. Regenerative Braking – Block Diagram

  23. Regenerative braking - System test • To test out the effectiveness of regenerative braking, the motor will be increased to a certain RPM with no load on a bench and full braking will be then applied. • Battery current and voltage, time and acceleration will be recorded. • From this data, we should be able to calculate: • Kinetic energy lost during the electric braking test from 65 mph to 0mph. • Electric energy gained during electric braking test from 65 mph to 0 mph. • Efficiency of converting kinetic to electric energy. • Braking torque during the mechanical and electric test.

  24. Regenerative Braking - Risk Assessment • Power generated from regenerative braking exceeds the charging capacity of the batteries. • The motor controllers have the ability to limit the current. • A supercapacitorcan be used to store the energy temporarily and allow more of the energy to go to the batteries. • Since regenerative braking will only be applied to the rear wheels, some instability may occur. • This may be mitigated by testing the stopping power of the regenerative braking system on a dynamometer before attempting a test on the track.

  25. Questions?