1 / 24

H.A.C SYSTEMS

H.A.C SYSTEMS. By: Burcu Ilk, Christian Bolus, Rana Rahim, Mariam Rasheed, Waqas Awaan, Mario Garcia, Margaret Barnwell, Syed Bokhari. HAC INC. 1234 Main ST Richmond VA 23218. MISSION STATEMENT.

altessa
Download Presentation

H.A.C SYSTEMS

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. H.A.C SYSTEMS By: Burcu Ilk, Christian Bolus, Rana Rahim, Mariam Rasheed, Waqas Awaan, Mario Garcia, Margaret Barnwell, Syed Bokhari

  2. HAC INC. 1234 Main ST Richmond VA 23218

  3. MISSION STATEMENT To provide an energy efficient, environmentally friendly air conditioning system to businesses and other organizations for the purpose of reducing operating costs by lowering energy consumption.  We seek to allow organizations the opportunity to bolster their reputations in their communities and around the globe by lowering their carbon emissions and reducing their impact on the environment.

  4. Hot Air In Cold Air Out Compressor External Voltage Distributor Current Distributing Wire Initial Water Fill Up Current Generating Tube System Technology

  5. STATEMENT OF ENERGY PERFORMANCE OMB Control No. 2060-0347 Building ID: 123456 For 12-month Period Ending: Dec 31, 2010 Date SEP becomes ineligible: Jan 01, 2011 Date SEP Generated: Jan 01, 2009 Facility Being Labeled Facility Owner Primary Contact for this Facility HAC INC. HAC INC. AJ SHAW 1234 Main St 1234 Main St 1234 Main St Richmond VA Richmond VA Richmond VA 123-456-7890 123-456-7890 Year Built: 2008 Gross Building Area (ft2): 20,000 Energy Performance Rating 2 (1-100): 80 Facility Space Use Summary Space Type Area (ft2) Occupants Operating Hours Number of PCs Garage 5,000 35 50 25 Office (General) 15,000 15 50 15 Professional Engineer Stamp I certify that the information contained within this statement is accurate and in accordance with the PE Guidelines. Indoor Environment Criteria Indoor air pollutants controlled? Yes Thermal conditions met? Yes Adequate Illumination provided? Yes

  6. GREEN-E RENEWABLE ENERGY CERTIFICATION(REC) HYDRO-AIR TECHNOLOGY, INC.

  7. CAMPUS SYSTEM OVERVIEW • Distributed all over campus • Easy water replacement • Minimal Maintenance • Equally efficient as single unit • Full Satisfaction Guaranteed

  8. MANAGEMENT • Organizational Culture • Organizational Ethics • Diversity • Motivation • Groups and Teams • Decision Making

  9. OPERATIONS

  10. MARKETING • Construction Companies • Building Management Companies • Architectural Design Teams • Businesses/Organizations

  11. Promotion Strategy • Direct Mail • Telemarketing/Cold Calling • Word of Mouth/Social Trend • Ad Placement with Clients • Building/Construction Magazines

  12. SWOT ANALYSIS

  13. Foreign Target Market • INDIA • Nationwide consumption due to weather • High Context VS Low Context • GDP growth rate 7.9%, ranked 28 in the worldSource: World Bank, World Development Indicators • Average Unit Cost in India$480.00 (Rs. 22,000.00) • H.A.C Unit introductory Cost $299.99

  14. ACCOUNTING Total Start-up Costs $570,000

  15. ACCOUNTING Total Monthly Operating Costs $430,000

  16. ACCOUNTING

  17. Example: Johnson Center • Average Cost per square foot: $3.00-$4.50 • Estimated Cost for JC (100,000 sq. ft.): $300,000-$450,000. • Possible Tax Deduction: $180,000 • Estimated Cost after tax break: $120,000-$270,000 • Electricity Bill Savings 25% a year

  18. Energy Policy Act of 2005 • Passed by Congress on July 2005. • Extended to December 31, 2013. • Tax deduction of $1.80 per square foot. • Johnson Center • 100,000 sq foot • Eligible for $180,000 • Investment Opportunity • PV: $180,000 • Rate: 5% • Time: 5 years • Future Value: $229,730.68

  19. 5 Year Projection

  20. LIMITATIONS • Cost • Research and Development • Competing Firms • Brand Recognition • Technology Advancement

  21. SUMMARY

  22. RESOURCES • Angenent, Lars. Interview with WUSTLPA. Creating Electricity From Waste Water (WUSTL). YouTube, St. Louis. January 03, 2008. • Ambani, Mukesh & Immelt, Jeffrey. Interview with Tarun Das. Entertainment Tonight. MukeshAmbani and Jeffery Immelt speak on India's 21st Century Business Models. YouTube, Mumbai, India. October 07, 2009Clark Construction Company. (n.d.). Retrieved November 17, 2009, from http://www.clarkconstruction.com/ • Clark Construction Company. (n.d.). Retrieved November 17, 2009, from http://www.clarkconstruction.com/ • DonohoeConstruction Company. (n.d.). Retrieved November 17, 2009, from www.donohoeconstruction.com/ • Freedomhouse. (n.d.). Retrieved November 17, 2009, from www.freedomhouse.org/ • Henkenius, M. (1998). Buying a Central Air Conditioning System. Popular Mechanics. Retrieved December 1, 2009 from http://www.popularmechanics.com/how_to_central/home_clinic/1275571.html?page= 2. • Jones Lang Lasalle. (n.d.). Retrieved November 17, 2009, from www.joneslanglasalle.com/ • Kinicki, A. & Kreitner, R. (2009). People and Organizations Management 301, McGraw-Hill Primis. • Perkins and Will Architects. (n.d.). Retrieved November 17, 2009, from http://www.perkinswill.com/locations/cities/Washington.aspx

  23. RESOURCES • Perkins and Will Architects. (n.d.). Retrieved November 17, 2009, from http://www.perkinswill.com/locations/cities/Washington.aspx

More Related