50 likes | 191 Views
Liaison Report from 802.18. Date : July 17, 2014.
E N D
Liaison Report from 802.18 Date:July 17, 2014 Notice:This document has been prepared to assist IEEE 802.15. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. John Notor, Notor Research
This document summarizes the activities of the IEEE 802.18 Radio Regulatory Technical Advisory Group (RR-TAG) during the IEEE 802 July 2014 Plenary Meeting at the Manchester Grand Hyatt, San Diego, CA. Overview John Notor, Notor Research
FCC Documents Approved • None John Notor, Notor Research
ITU-R Documents Approved • On behalf of 802.16: Proposed LS to ITU-R WP 5D: OOBE information for WirelessMAN-Advanced, 18-14/46r2 • On behalf of 802.11: Annex 19 working document toward a preliminary draft new recommendation ITU-R M.[V2X], 18-14/48r2 John Notor, Notor Research
Other Matters • The RR-TAG reviewed the status of the RR-TAG OM, planned for future work, and is looking to complete the draft by the November 2014 Plenary meeting. • The RR-TAG scheduled meetings for every two weeks beginning Wednesday, August 20, 2014 through December 10, 2014. The meetings are scheduled to start at 11 AM ET. An agenda will be posted at least two weeks prior to the individual meeting. • The RR-TAG adjourned in PM1 on Wednesday. The next face to face meeting of the RR-TAG will be at the November 2014 Plenary. John Notor, Notor Research