2. Texas Tech Test Well Facilities. Department of Petroleum EngineeringLubbock, Texas. 3. Texas Tech Test Well Facilities. The purpose of the Test Well Facilities is:(1) to provide the faculty with a location for training undergraduate students in oil field operations. These facilities will be integrated into the Natural Gas and Production Engineering Laboratory curriculum. (2) to provide the Texas Tech University with a research facility for full-scale testing and development of oil and29843
E N D
1. 1 Test Well Facilities
2. 2 Texas Tech Test Well Facilities Department of Petroleum Engineering
Lubbock, Texas
3. 3 Texas Tech Test Well Facilities The purpose of the Test Well Facilities is:
(1) to provide the faculty with a location for training undergraduate students in oil field operations. These facilities will be integrated into the Natural Gas and Production Engineering Laboratory curriculum.
(2) to provide the Texas Tech University with a research facility for full-scale testing and development of oil and gas production technologies.
4. 4 Texas Tech Test Well Facilities Oil field Production Facilities (Design, and Installation)
Tanks
Separators
Heater Treaters
Production Piping Standards (ASME B31.3)
Operations
Well completion Technologies (Wellhead and Wellbore Tubulars)
API Measurement Standards (API MPMS)
(Thieving, Sampling, Hydrometers, Quantity, and Quality)
LACTS
Work-over Rig Procedures
Down-hole tools (packer, anchors, mandrels, ports, etc.)
Safety and Rig Practices
5. 5 Texas Tech Test Well Facilities Artificial Lift Design and Optimization
Beam Pumping (Pump Slippage, Rod Dynamics, Pump-Off Control)
Plunger Lift (Plunger Run time, Fall Rates, Pressure Requirements)
Gas Lift Installation (Valve Setting and Pressure Differentials)
Instrumentation
Acoustic Well Sounding
Temperature Surveys (Fiber Optic Distributed Temperature Survey)
Production Smart Well Technologies
Fluid Flow Dynamics (Multiphase)
Development of Accurate multiphase flow gradient curves
Heavy Oil Production Techniques
Thermal Methods
PCP Technologies
Ball Pump Technologies
6. 6 Texas Tech Test Well Facilities TTU Property (East Loop 289, Lubbock)
(8.7 acre tract)
7. 7 Texas Tech Test Well Facilities TTU P-5 Organization Report
(Texas Railroad Commission)
8. 8 Corporate Project Sponsors Drilling Contractor
9. 9 Corporate Project Sponsors Surface & Production Casing
4087.8 ft, 9-5/8, 43.5 #/ft, N-80, API 8rd LT&C, Range 3
316 ft., 13-3/8, 48.00 #/ft, H-40, API 8rd ST&C, Range 3
10. 10 Corporate Project Sponsors Drilling Location Preparation
11. 11 Corporate Project Sponsors Casing Crew Services
12. 12 Corporate Project Sponsors Rat Hole, Mouse Hole, Anchors,
Conductor Pipe
13. 13 Corporate Project Sponsors Cementing Services
(Surface Casing and Production String)
14. 14 Corporate Project Sponsors Cementing Services
(Cement Float Equipment)
15. 15 Corporate Project Sponsors Drilling Bits
17 in. mill tooth bit (Surface Hole) 12-1/4 in mill tooth bit (2000 ft)
12-1/4 in. button bit (2000 ft 4000 ft)
16. 16 Corporate Project Sponsors Open Hole Logging
17. 17 Corporate Project Sponsors Coring Services
18. 18 Corporate Project Sponsors Drilling Fluids Program
19. 19 Corporate Project Sponsors Pipe Dope (Casing)
20. 20 Corporate Project Sponsors Cased Hole Logging Services
21. 21 Corporate Project Sponsors Surface Casing Head, Production Casing Head
Dual Completion Tubing Head (5M Rating)
22. 22 Corporate Project Sponsors Sucker Rod Pumping Unit
C456D-305-144
23. 23 Corporate Project Sponsors Inertial Guidance Rate-Gyroscopic Survey
24. 24 Corporate Project Sponsors Separation Facilities
Two-Phase 1440 psi Separator, and Low Pressure Heater Treater
25. 25 Corporate Project Sponsors Gas Compression
Two-Stage Ajax DCP-140
26. 26 Corporate Project Sponsors Sucker Rod Pumping Surface Equipment
27. 27 Corporate Project Sponsors Controllers for ESP and Sucker Rod Pumping Motors
28. 28 Corporate Project Sponsors Polish Rod and 4020 ft Sucker Rod String
29. 29 Texas Tech Test Well FacilitiesConclusions The Department of Petroleum Engineering is working to secure corporate donations for the required surface production equipment. We estimate that we will have the Texas Tech Test Well Facilities operational by June 2003.
In addition to equipment donations, the Department of Petroleum Engineering is planning to contact major integrated oil companies about conducting research with us in order to sponsors graduate student education.
30. 30 Texas Tech Test Well FacilitiesConclusions The department has contacted ATMOS Corporation in order to connect to their existing natural gas pipeline. The primary purpose for the gas connection is to:
Fuel surface facilities.
Commingle gas with oil and water to measure multiphase pressure drops.
Demonstrate and measure the effectiveness of Gas Lift installations.
Demonstrate the operating principles of Plunger lift installations.
31. 31 Texas Tech Test Well FacilitiesConclusions
Upon project completion, we want to advertise the facility and publicize its corporate sponsors.
We hope that the Texas Tech University Test Well Facilities will become one of the premier Educational and Production Research Facilities in the nation.
32. February 7, 2003 Version 14.00 32 Texas Tech Test Well FacilitiesContact Information For Additional Information, Please Contact:
James Chris Cox
Assistant Professor
Texas Tech University
Department of Petroleum Engineering
P. O. Box 43111
Lubbock, Texas 79409-3111
Phone: (806) 742-3573
Fax: (806) 742-3502
Email: chris.cox@coe.ttu.edu