Advanced Accelerator Test Facilities at Daresbury Laboratory

Advanced Accelerator Test Facilities at Daresbury Laboratory. Peter McIntosh (STFC Daresbury Laboratory) 2 nd PASI Workshop , RAL April 3 - 5, 2013. Overview. Daresbury Test Facilities: ALICE: SRF Cryomodule R&D RF Control – Microphonics and Lorenz Detuning EMMA NS-FFAG:

cedric
Download Presentation

Advanced Accelerator Test Facilities at Daresbury Laboratory

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Advanced Accelerator Test Facilities at Daresbury Laboratory Peter McIntosh (STFC Daresbury Laboratory) 2nd PASI Workshop, RAL April 3 - 5, 2013

  2. Overview • Daresbury Test Facilities: • ALICE: • SRF Cryomodule R&D • RF Control – Microphonics and Lorenz Detuning • EMMA NS-FFAG: • Beam Dynamics Studies • RF Control – Vector Sum Architecture • VELA: • Deflecting Cavity Diagnostics • Collaborative Opportunities • Conclusions

  3. ALICE ERL Facility 8 MeV Compressor Photoinjector Laser IR-FEL Booster 35 MeV 8 MeV Acceleration • ALICE at Daresbury Laboratory operates using Energy Recovery principle. • Only accelerator of its type in Europe. • Used as an R&D test facility for next generation electron beam technology development. Linac Deceleration http://www.stfc.ac.uk/ASTeC/Programmes/Alice/35997.aspx

  4. ALICE Operating Parameters

  5. New SRF Cryomodule • Collaboration formulated in early 2006 to design and fabricate new CW cryomodule and validate with beam. • Dimensioned to fit on the ALICE ERL facility at Daresbury: • Same cryomodule footprint. • Same cryo/RF interconnects. • ‘Plug Compatible’ with existing cryomodule.

  6. CM Component Testing Saclay-II tuner with wider aperture and low voltage piezocartridges, pinned and stress tested. Modified Cornell ERL injector coupler with a shortened cold section, high power conditioned. DESY superstructures (7Z2 & 7Z4) modified to incorporate optimised end groups. Cavities, cold couplers and central HOM absorbers installed. Cryomodule assembled & undergoing final cold testing.

  7. Assembly and Integration

  8. DLLRF Implementation • LLRF4 • Designed at LBNL by L.Doolittle • Open source • Xilinx spartan3 FPGA • 4 -14 bit ADC Channels • 2 -14 bit DAC's • USB comms • Clock management chip • Cost ~$3k, built and tested • System installed in 2011 on NC buncher cavity. • To also install on SRF cavities: • 1.3 GHz. • High Q Superconducting Cavities. • 4ms pulse & CW • Fast feedback • Feed Forward for beam loading compensation.

  9. EMMA NS-FFAG EMMA is the only accelerator of its type in the world! http://www.stfc.ac.uk/ASTeC/Programmes/17426.aspx

  10. Applications of NS-FFAGs • Proton & Carbon Therapy • Neutrino Factory High power proton driver • Accelerator driven reactor • Dedicated Muon Source

  11. EMMA Objectives • Fixed energy operation to map closed orbits and tunes vs momentum • Many lattice configurations • Vary ratio of dipole to quadrupole fields • Vary frequency, amplitude and phase of RF cavities • Map longitudinal and transverse acceptances with probe beam from ALICE • EMMA is heavily instrumented with beam diagnostics

  12. EMMA 6-Cell Girder Assembly F Magnet Location for diagnostics Cavity D Magnet Ion Pump Girder Beam direction

  13. EMMA Ring Configuration Wall Current Monitor LLRF First user of Libera LLRF Located ~ 30 m from machine Septum Power Supply Kicker Power Supplies YAG Screen YAGScreen Septum Power Supply Kicker Power Supplies eBPM x 81

  14. Realisation of EMMA August 2010 First Turn Second Turn 16th Aug 2010

  15. Optimising RF for Acceleration • ToF zero crossing of each cavity to find optimum phase angle. • Beam loading effects could be seen on Libera system during phase optimisation. • Possibility to zero cross each cavity, tune for maximum acceleration. • Close Libera RF control loop to keep track of the correct phase of the system: • phase accumulator is reset during sweep. • LLRF control essential in order to achieve successful beam acceleration.

  16. Successful acceleration in serpentine channel demonstrated. Published in Nature Physics (01/03/12) EMMA Acceleration Achievement Measured March 2011

  17. VELA – Versatile Electron Linear Accelerator (ex EBTF) • For the development and testing of novel and compact accelerator technologies. • Through partnership with industry and the scientific community. • Aimed at addressing applications in medicine, health, security, energy, industrial processing and science. • Will enable research into areas of accelerator technologies which have the potential to revolutionise the cost, compactness and efficiency of such systems. • The main element of the infrastructure:- high performance and flexible electron beam injector facility feeding customised state-of-the-art testing enclosuresand associated support infrastructure. • Critical for development of underpinning technologies; • Advanced Beam Diagnostics, • Accelerating and Dipole Mode RF Structures, • RF Sources and Distribution Systems, • Vacuum Systems, • Magnet Systems, • Beam-based Feedback and Control Systems, • Beam Synchronisation Systems. VELA Pulsar

  18. Accelerator Modules Module 4 Module 3 Module 5 Module 6 Module 1 Module 2 Module 1 http://www.stfc.ac.uk/ASTeC/Programmes/EBTF/38426.aspx

  19. VELA/CLARA Beam Parameters

  20. Transverse Deflecting Cavity Beam Diagnostic

  21. TDC Characterisation Estimated peak transverse voltage 5 MV (limited by available RF power) E-field H-field 3-cell TDC prototype (RI GmbH)

  22. VELA Status and Layout Injector Room Enclosure 2 Control Room Rack Room First electrons by end April 2013 First beams for exploitation July 2013. Synchronisation Room Laser Room

  23. Collaborative Opportunities • SRF Cryomodule Operation (ALICE): • CW SRF Cavity Operation: • Thermal Characterisation • Microphonics Assessment & feedback/forward Control • NS-FFAG Beam Dynamics (EMMA): • Serpentine Acceleration • RF Control Processes • Slow RF acceleration – Induction techniques? • Magnet Systems (Conventional & SC) • Deflecting/Crab Cavities (VELA/ALICE/EMMA): • Structure Designs • RF Control Developments • Vacuum Systems (VELA/ALICE/EMMA)

  24. Conclusions • Innovative and unique accelerator test facilities available at Daresbury: • ALICE – Europe’s only ERL Facility • EMMA – World’s only NS-FFAG • VELA – High performance beam injector • Each allow for technology development and/or demonstration. • Although machines use electrons, compliance exists for proton technologies: • Accelerator Systems • RF Control/feedback/feed-forward/synchronisation • Deflecting/Crab Cavity Systems (Diagnostics/Beam Manipulation) • Magnets • Vacuum Systems • Opportunity to explore UK-FNAL collaboration in these (or other) areas.

  25. THANK YOU!