An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PEAK衡量

  2. How to do PEAK? 7大步驟: • 組織團隊 (Organize structure & team) • 教育訓練 (Education & Training) • 流程檢視及建立 (Process Review & Re-designed) • 全員投入 (Top management & employee involved) • 優化流程 (Policy & Process control) • 評定執行成效 (KPI & Class A Assessment) • 改進計劃 (P – D – C - A)

  3. 組織團隊 (Organize structure & team)

  4. How to do PEAK? 流程檢視及建立 產品管理的各項流程包括現有產品銷售狀況檢討及新產品開發時程管理 (Joanna – Marketing team) 需求管理的各項流程包括銷售計劃的流程及24個月預估需求量計劃流程 (Vicky – Sales team and Sharlin – Shop team) 供應管理的各項流程包括供貨計劃的流程、生產計劃流程及供應商計劃的流程 (Peggy – SC team and Frank – WCF plant) 整合協調各項管理流程包括產品管理、需求管理、供應管理的差異或績效 ,並於MBR會議提報討論結果(Phoebe – Stream leaders)

  5. Class A Assessment A級評量 評量原則: • 工具有效性 • 目標的達成 • 證據(evidence) 四個標準: • 檢測表(37個項目)評分3.5分以上(平均分,每一項都不低3分) • 我們自己覺得已經達到A級 • 顧問公司也覺得我們達到了A級 • 我們的顧客覺得我們達到了A級(根據評分)

  6. 願景和使命

  7. PEAK GM Taiwan • What is PEAK?(是什麼?) • How to do PEAK? (怎麼做?) • Key milestone (進度與主要時程)

  8. Jan 10 Jan 11 Mar 09 Oct 10 Dec 10 Dec 08 Aug 09 Aug 10 Jun 09 正式評估期 預審及準備 計畫及控制培訓 自評 及流程設計討論會 新流程試運行 全面實施 完成流程設計

  9. How to do PEAK? • 組織團隊 (Organize structure & team) • 教育訓練 (Education & Training) • 流程檢視及建立(Process Review & Re-designed) • 全員投入 (Top management & employee involved) • 優化流程 (Policy & Process control) • 評定執行成效 (KPI & Class A Assessment) • 改進計劃 (P – D – C - A)

  10. 你還記得嗎? • 什麼是PEAK? • 流程優化與知識、3個圈圈、5個會議、營運整合管理 • PEAK的推行進度? • 2010.1月正式運行、2010.10~12月正式評核 • 工廠監控哪些KPI? • 主計畫完成率、生產排程表現、生產排程穩定度、供應商供貨表現、產品第一時間放行、BOM表準確率、原物料/成品循環盤點準確度 • 推行PEAK的目標是什麼? • 2010.12月獲得Class A

  11. 請記住 PEAK • 流程優化與知識 • 三個圈圈 • 五個會議(PMR, DR, SR, RR, MBR) • S&OP, IBM • 計劃性 • Class A, 2011.1 • 37個問題, 3.5分以上

  12. GM Taiwan PEAK • Process Excellence And Knowledge 流程優化與知識 Class A,2011,1 Yes, we can! 人員/行為 World Class 流 程 工 具