Japan Aerospace Exploration Agency K.Kawate , M. Miyoshi, S. Nakamura and S . Kogure

The development result of the ground infrastructure for Real time PPP experiment by using QZSS. Japan Aerospace Exploration Agency K.Kawate , M. Miyoshi, S. Nakamura and S . Kogure H.Soga and Y.Hirahara @NEC A.Yasuda and T.Takasu@Tokyo University of Marine Science and Technology.

amal-hyde
Download Presentation

Japan Aerospace Exploration Agency K.Kawate , M. Miyoshi, S. Nakamura and S . Kogure

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The development result of the ground infrastructure for Real time PPP experiment by using QZSS Japan Aerospace Exploration Agency K.Kawate, M. Miyoshi, S. Nakamura and S. Kogure H.Soga and Y.Hirahara @NEC A.Yasuda and T.Takasu@Tokyo UniversityofMarine Science and Technology

  2. Outline Real-time PPP Service via QZSS Development Status of the Ground Infrastructure for Real-Time PPP Service - MGM-net (monitoring network) - MADOCA (Multi-GNSS offline & real-time estimator) Evaluate Result - Estimate accuracy of orbit and clock by MADOCA - PPP accuracy with MADOCA products +Announcement PPP WORKSHOP 2013

  3. Introduction Prediction of visible satellites in 2020 Background -Progression of “Multi-GNSS” by increase of positioning satellites - Expansion of GNSS utilization field Not only Positioning, Navigation and Timing , But also Applied researches # of sats 101520 253035 Real-time PPP service with cm-level accuracy is required! Today’s Topic “Development of Real-time PPP service using Multi-GNSS via QZSS by JAXA” - Multi-GNSS monitoring network “MGM-net” - Precise Multi-GNSS orbit and clock estimator “MADOCA” - MADOCA-LEX signal PPP WORKSHOP 2013

  4. Real-time PPP Service via QZSS PPP WORKSHOP 2013

  5. Service via QZSS ( 1 / 2 ) What’s QZSS QZSS (Quasi-Zenith Satellite System) - Regional Positioning system which can stay near zenith over Japan for many hours - Service area : all over Asia and Oceania region First Quasi-Zenith Satellite “Michibiki” - Sep. 11, 2010 Launch byH-IIA 18th - June. 22, 2011Start of public service(L1C/A, L2C) Role of “Michibiki” 1)”GPS Availability Enhancement” (L1C/A, L2C, L1C, L5 signal) 2) “GPS Performance Enhancement“(L1-SAIF, LEX signal) PPP WORKSHOP 2013

  6. Service via QZSS ( 2 / 2 ) Service via QZSS Effective field of real-time PPP service via QZSS - Broadcast of orbit and clock correction message using LEX signal • LEX signal • - Center frequency : 1278.75MHz • - Transfer rate : 2 kbps • - Massage : Some messages broadcasted by time sharing • (JAXA、SPAC、NICT、GSI) LEO satellite Weather Forecast Precise Agriculture Car/Human Navigation Tsunami detection Crustal deformation monitoring PPP WORKSHOP 2013

  7. Development status of the Ground Infrastructure for Real-Time PPP Service PPP WORKSHOP 2013

  8. Development status of the ground infrastructure ( 1 / 7 ) System of Real-time PPP Service Development of ground infrastructure for providing real-time PPP service - Target PPP Accuracy in this system is less than 10 cm(H/VRMS) GLONASS QZSS Galileo GPS navigation signal ・・・ LEXsignal MGM-net etc. MGM-net etc. LEX message NTRIPCaster (provided by BKG) Tracking&ControlStation PPP users PPP users RTCM, Raw, BINEX… @Okinawa LEX message Data interface Master Control Station(MCS) orbit & clock estimator LEX message generator RTCM SSR LEX message Target accuracy < 10cm (H/V RMS) MADOCA MADOCA @Tsukuba PPP WORKSHOP 2013 8

  9. Development status of the ground infrastructure ( 2/ 7 ) MGM-net (Multi-GNSS Monitoring network) • Aim of MGM-Net • -Improvement of Multi-GNSS orbit and clock estimate accuracy • - Promotion of Multi-GNSS experiment including QZSS • ■Please visit“MGA” website for detailed →www.multignss.asia • → Call for Application of JAXA’s Rx hosting sites from 2011 Call for Application continuously until arranged 60 sites!! ★JAXA’s(9) ●MGM-net(Hosting) on running (11) ● MGM-net(Hosting) under construction (13) ■ MGM-net(Sharing) (7) ▲MGM-net(Sharing based on agreement) (40) PPP WORKSHOP 2013

  10. Development status of the ground infrastructure ( 3 / 7 ) MGM-net ~International cooperation (Multi-GNSS Monitoring network) International Cooperation - Expansion of Multi-GNSS monitoring network - Cross-check of orbit and clock estimate result →Plan to participate into IGS M-GEX project International Cooperation - Expansion of Multi-GNSS monitoring network - Cross-check of orbit and clock estimate result ★JAXA’s (9) ●MGM-net(Hosting) on running (11) ● MGM-net(Hosting) under construction(13) ■ MGM-net(Sharing) (7) ▲MGM-net(Sharing based on agreement) (40) ▲other partner’s (based on agreement)(4) PPP WORKSHOP 2013

  11. Development status of the ground infrastructure ( 4 / 7 ) MADOCA (Multi-GNSS Advanced Demonstration tool for Orbit and Clock Analysis) • Aim of MADOCA • - Estimation of orbit and clockwith high accuracy • - Multi-GNSS Support (GPS, GLONASS, QZSS and Galileo) • Development • - NEC, Tokyo University of Marine Science and Technology and JAXA • Goal • - Estimate accuracy comparable to IGS products for RT positioning with < 10cm accuracy Table. 1 Development Schedule & Target Accuracy PPP WORKSHOP 2013

  12. Development status of the ground infrastructure ( 5 / 7 ) MADOCA (Multi-GNSS Advanced Demonstration tool for Orbit and Clock Analysis) Parameter Adjustment - Precise orbit & clock estimation using latest models - Reduction of processing time - High Stablity of numeric calculation Table2 Parameter Adjustment PPP WORKSHOP 2013

  13. Development status of the ground infrastructure ( 7 / 7 ) MADOCA-LEX (Multi-GNSS Advanced Demonstration tool for Orbit and Clock Analysis) • Format • - Definition of MADOCA-LEX format as MT=12 based on RTCM SSR • LEX message ・・・ • (cf)RTCM SSR RTCM Message #1 ・・・ RTCM Message #2 • RTCM SSR MT using MADOCA-LEX message (* : draft ) LEX message (2000) Data Section(1695) Please check ! • ■Please visit QZSS websites “QZ-vision” → http://qz-vision.jaxa.jp/USE/is-qzss/index_e.html PPP WORKSHOP 2013

  14. Evaluate Result PPP WORKSHOP 2013

  15. Reported Evaluation result ( 1 / 6 ) Evaluation of offline estimation GPS & GLONASS estimation - Comparable accuracy with IGS ACs GPS GLONASS QZSS orbit estimation - <6 cm accuracy on overlap evaluation QZSS 2011/06/04 - 2011/11/03 (153 days), 24 H-overlap (cf.) Overlap evaluation 12H 48H12H +1m Arcs R -1m A Overlap error C R :2.37cm ,A :4.47cm , C :3.21cm, 3D :5.99cm PPP WORKSHOP 2013 2011/01/01 -12/31 (365 days), wrt IGS Final

  16. Reported Evaluation result ( 2 / 6 ) Evaluation of offline PPP Offline PPP around Asia and Oceania area using MADOCA offline products - Offline PPP accuracy of enough less than 10cm !! Average 3.8cm (HRMS) 5.6cm (VRMS) 2013/01/13 -1/20 (8 days), RTKLIB2.4.1b12, wrt PPP-static using IGS Final PPP WORKSHOP 2013

  17. Evaluation result ( 3 / 6 ) Evaluation of simulated RT estimation Simulated*1 GPS real-time estimation (1/2) - Achievement of orbit accuracy of < 4 cm and clock accuracy of ~ 0.1 ns Orbit Error (Radial/Along/Cross) Architecture Clock Error R:1.52cm/A:2.49cm/C:1.81cm 3D:3.44cm *1 : Evaluation of real-time estimator using simulated real-time data based on RINEX STD:0.114ns / RMS:0.184ns 2012/2/1- 2/14(14days),31 GPS satellites wrtIGSFinal(* First 24H and unhealthy G14 excluded) PPP WORKSHOP 2013

  18. Evaluation result ( 4 / 6 ) Evaluation of simulated RT PPP Simulated GPS real-time estimation (2/2) - Achievement of PPP accuracy of enough less than 10 cm +0.2m with Simulated MADOCA Clock/Orbit E -0.2m N RMS * E:1.93cm N:1.46cmU:3.91cm U +0.2m with IGS FINAL E RMS * E:1.80cmN:1.42cm U:3.25cm -0.2m N U 2012/2/2- 2/14(13days),RTKPOST2.4.2, wrtIGSFinal POS (* First 1Hexcluded) @TKSB 18 PPP WORKSHOP 2013

  19. Evaluation result ( 5 / 6 ) Evaluation of RT estimation Ground Test of RT estimator (1/2) - Ground Test of real-time estimator via NTRIP caster using MGM-net and IGS/MGEX sites MGM-net (5) JAXA’s (8) Sharing (7) Other partner’s (5) IGS/MGEX (21) PPP WORKSHOP 2013

  20. Evaluation result ( 6/ 6 ) Evaluation of RT PPP Ground Test of RT estimator (2/2) - Achievement of PPP accuracy of < 10 cm using only GPS +0.5m with Ground Test MADOCA E-W RMS E: 2.51 cm N: 2.20 cm U: 7.57 cm -0.5m N-S 10cm U-D with Real Time IGS E-W RMS E: 6.02 cm N: 3.75 cm U: 9.61 cm N-S 10cm U-D 2013/5/209:00-21:00(12h),RTKLIB2.4.2,1Hz, wrtIGS Final POS PPP WORKSHOP 2013

  21. Announcement PPP WORKSHOP 2013

  22. Announcement ( 1 / 3 ) START of Test Broadcast • Test Bradcast • - Start of MADOCA-LEX signal broadcast via “QZSS” on a trail !! • 1st April 11 - April 13 • 2nd April 26 - May 3 • 3rd May 28 - June 1 • On TestJune 9 - June 15 • Experiment Schedule • Please see “Experiment Schedule” on QZ-vision because LEX signal is on test. Please check here! • ■Please visit QZSS websites “QZ-vision” → http://qz-vision.jaxa.jp/USE/en/exp_schedules PPP WORKSHOP 2013

  23. Announcement ( 2 / 3 ) START of Test Broadcast PPP using MADOCA-LEX - Achievement of PPP accuracy of ~ 10 cm using GPS+QZS +0.5m with MADOCA-LEX E-W -0.5m RMS E: 3.54cm N: 1.99 cm U: 13.10 cm N-S 10cm U-D 2012/5/30 12:00:00-23:59:59(12 hours),RTKLIB2.4.2,31 GPS+QZS satellites, wrtPPP-static, IGSFinal POS @NCKU Architecture LEX sig. RTCM BINEX RAW LEX msg. MGM-net IGS/MGEX MCS MADOCA JAXA’s LEX receiver SSR orbit&clock estimator LEX message generator SSR @Okinawa @Tsukuba PPP WORKSHOP 2013

  24. Announcement ( 3 / 3 ) START of Test Broadcast Demonstration of PPP using MADOCA-LEX QZSS Please see PPP using MADOCA-LEX ! 8:30 Ottawa 8:30 Tsukuba Architecture LEX sig. RTCM BINEX RAW LEX msg. MGM-net IGS/MGEX MCS MADOCA JAXA’s LEX receiver SSR orbit&clock estimator LEX message generator SSR @Okinawa @Tsukuba PPP WORKSHOP 2013

  25. Summary • Development status of ground infrastracture real-time PPP service ‐ MGM-net : Expansion of Multi-GNSS Monitoring Network(84 sites) - MADOCA : Development of Multi-GNSS orbit and clockestimator with high accuracy Achievement of “real-time” PPP service with < 10 cm (H/VRMS) accuracy on ground test • Future Plan - Evaluation of long-term stability of real-time estimator - Function addition for higher accuracy (PPP-AR, BeiDou etc.)   → We aim to join IGS analysis centers in the future! - Start of regular broadcast of MADOCA-LEX signal We look forward to providing real-time PPP service via QZSS!! PPP WORKSHOP 2013

  26. Thank you for your attention!! PPP WORKSHOP 2013