Waste and failure demand
Waste and failure demand. Lean Conference, University of St. Andrews November 2010. Muri, mura, muda. Mura = unevenness, fluctuation, variation. Muri = overburden. No Muri, Mura or Muda. Muda = waste. 7 Manufacturing Wastes. Movement. Transportation. Over Processing. Over production.
919 views • 7 slides