80 likes | 364 Views
Wastewater Treatment Processes. Application _WWTP Design. Please Look deep in the following Table. 1. Calculate the needed equalization Capacity for the inflow to the plant?. 2. Design a primary settling circular tank the WWPT to achieve a 60% SS reduction.
E N D
Wastewater Treatment Processes Application _WWTP Design
1. Calculate the needed equalization Capacity for the inflow to the plant? 2. Design a primary settling circular tank the WWPT to achieve a 60% SS reduction
3. For a complete mix activated sludge system with the following conditions: • Q Recycle = 210 m3/d • C TS,Bio-reactor = 5 g MLSS/L • BOD5,Effleunt = 25 mg/L, • F/M = 0.05 kg BOD5 /kg MLSS*d, • Determine the aeration tank volume? • Determine the sludge amount (QExcess) wasted daily? • Calculate the specific sludge production and show it as f (t)? • Design a phosphate elimination station for three Months use? • Find the volume of a suitable sedimentation Basin with a depth of 6m? • (Assume: SV= 500 ml/l, qSV = 300 l (m2 h)-1) • 6. Describe the Sedimentation characteristics?