RENAISSANCE ZARAGOZA WP2 : Monitoring and analysis

RENAISSANCE ZARAGOZA WP2 : Monitoring and analysis. 7th RENAISSANCE meeting- Lyon 28/04/2009. Rodrigo Vásquez Technical Coordinator & UdZ- RENAISSANCE. WP 2. Objectives Verification of Design hypothesis (WP 2.2 & WP 5.1) Analysis of local weather variations (WP 2.1 & WP 2.2 & WP 5.1)

amena-hardy
Download Presentation

RENAISSANCE ZARAGOZA WP2 : Monitoring and analysis

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RENAISSANCE ZARAGOZA WP2 : Monitoring and analysis 7th RENAISSANCE meeting- Lyon 28/04/2009 Rodrigo Vásquez Technical Coordinator & UdZ- RENAISSANCE

  2. WP 2 • Objectives • Verification of Design hypothesis (WP 2.2 & WP 5.1) • Analysis of local weather variations (WP 2.1 & WP 2.2 & WP 5.1) • Energy certification studies (WP 2.1 & WP 2.2 & WP 5.1) • Human behaviour impact verification (WP 1.5 & WP 2.2 & WP 2.3)

  3. ZAR-Design verification • In order to verify the bioclimatic design UdZ has developed several activities that allow obtaining the necessary data. • Getting the first data from Block through of optical digital network (Telemando) (WP 2.1) • Meeting with Endesa company (EDE) to define the way to get measures from electrical meters (WP 2.1 & WP 2.3) • Meeting with GasAragon in order to define the appropriated gas meter devices. (WP 2.1 & WP 2.3) • Installation finished of sensors to measure the renewable energies contribution. (WP 2.1 & WP 2.2 & WP 2.3)

  4. ZAR-local weather analysis • Acquisition of weather variables in order to analyze the local weather impact. • Sensors distributed in Valdespartera to collect data of temperature, humidity and wind.

  5. ZAR-Energy certification • Follow a schema of activities in order to develop a methodology of energy certification. The procedure includes: • Blocks simulation and energy evaluation • Blocks Thermography • Heat transfer through the building envelope (equipment in purchase process) • Blower door tests • Technical inspection to heating system (in process)

  6. ZAR-Human behaviour • Human behavior impact the performance of buildings (WP 1.5) • Inadequate ventilation, curtain and blinds in greenhouse, high temperature set have a high influence in dwelling thermal behavior

  7. Activities UdZ • (local leader on Monitoring) • Detailed presentation of WP2.1, 2.2 • + WP2.3 = done with Lyon

  8. WP 2 • Summary • WP 2.1: Integrated Energy Network • WP 2.2: Quality Control and Performance Analysis • WP 2.3: Common Monitoring and Analysis (included LYON’s activities)

  9. WP 2.1: Integrated Energy Network • State of progress 6 first months • Report action taken with reference to project work plan • Specification establishment in order to get data in the demonstrative building (construction finalization in June) • Final meeting with Power companies to define all data they provide, acquisition software, amount and frequency of data • Equipment installation finished in 10 blocks • First data acquired blocks 21 & 29 trough digital network, data from p12 & p14 locally • Blocks simulations (TSBI3 & EnergyPlus). Blocks : P13, P14, P20, P21, P27 • Thermography laboratory test to analyses several materials and wall thickness • Highlight achievements • Standardization of data from several sources • Block connection to digital network • Data acquisition from Valdespartera offices (this equipment to be changed to demonstrative building) • Explain problems and deviations from plan • Gas Equipments aren’t compatibles with automatic acquisition. • Several problems of digital network (power failures) • Physical connection between block and digital network wasn’t available in some cases, and by street works interrupting the Fiber Optic route

  10. WP 2.1: Integrated Energy Network • Equipment Installation summary • Four blocks connected to digital network • Data acquired from two blocks trough digital network • Data acquired from two blocks with locals equipment • Five blocks in standby to connect digital network

  11. WP 2.1: Integrated Energy Network • Analysis of progress • Strong / weak points • S: Good relationships with power utilities, promoters and architects • W: Works of wiring unfinished by promoter • How to improve quality of work • Demand the fulfillment of the works planned • How to exploit collaboration / networking opportunities • Explain action taken to overcome problems • major coordination between builders and technicians

  12. WP 2.1: Integrated Energy Network • Plans for the next 6 months • Calendar of action • April : Data acquisition from five blocks via digital network • Sept: First tests in the demonstrative center • Overview of local work • List of deadlines • Roadmap of key events or target groups (dissemination) • Connection entire blocks to digital network • Gathering of gas and electricity data via automatic acquisition software • Installation of an acquisition server in demonstrative center • Identification of people responsible

  13. WP 2.2: Quality Control and Performance Analysis • State of progress 6 first months • Report action taken with reference to project work plan • Follow a schema of activities in order to develop a methodology of energy certification. The procedure includes: • Blocks simulation and energy evaluation • Blocks Thermography • Heat transfer through the building envelope (equipment in purchase process) • Blowerdoor tests • Technical inspection to heating system • Renewables • Highlight achievements • Air leakages detection • Thermals bridge and heat flows detection • Explain problems and deviations from plan • Problems to detect fails in ventilated facades with Thermography. • Airflows by plugs, electrical covers and extractor hood, can modify significantly the results

  14. WP 2.2: Quality Control and Performance Analysis • Analysis of progress • Strong / weak points • S: High precision equipment available • W: Limited experience in these devices • How to improve quality of work • Increase the amount of building analized • How to exploit collaboration / networking opportunities • Explain action taken to overcome problems • Work in conjunctions with other locals partners with vast experience in thermal photography

  15. WP 2.2: Quality Control and Performance Analysis • Plans for the next 6 months • Calendar of action • May : Thermal photography finalization • Overview of local work • List of deadlines • Roadmap of key events or target groups (dissemination) • Exposition of results analysis to architects and constructors • Report about impacts of air renovation, leakages, heat losses over consumptions and energy demands • Identification of people responsible

  16. WP 2.3: Common Monitoring and Analysis • State of progress 6 first months • Lyon strategy : • Complete definition of monitoring techniques (done) • Several Planning of phases have been defined depending on allowed extra-time (from 0 to 2 years scenario) • Zaragoza strategy: • BLowerdoor test , images with a termographic camera (done) • Facilities for inside building monitoring are ready to operate and connected by digital network (done) • First data from 21 reached (done) • Comparison between Lyon & Zaragossa • Several exchanges (just start)

  17. WP 2.3: Common Monitoring and Analysis

  18. WP 2.3: Common Monitoring and Analysis Energy Consumptions

  19. WP 2.3: Common Monitoring and Analysis Energy Performance

  20. WP 2.3: Common Monitoring and Analysis COMFORT and Indoor Air Quality

  21. WP 2.3: Common Monitoring and Analysis HUMAN BEHAVIOR

  22. WP 2.3: Common Monitoring and Analysis • Analysis of progress • Strong / weak points • Lyon and Zaragoza not in phase • Independent choice of monitoring techniques => emergence of interesting ideas in each community • How to improve quality of work • Multiplication of exchange has to be planed • Common database including test and measures results • How to exploit collaboration / networking opportunities • Explain action taken to overcome problems

  23. WP 2.1: Integrated Energy Network • Plans for the next 6 months (end of year 3) (1 slide) • Calendar of action • Joint evaluation of developments on innovative techniques (wall conductance UdZ, natural ventilation flow CETHIL-INSA) (next 3 months) • Beginning of feedback on performance of the PV monitoring in Lyon (Hespul internship) (next 6 months) • Lyon :No feedback from WP 2.2 in the next 6 months • First draft of the monitoring strategy referential (next 6 months) • Overview of local work • List of deadlines • Roadmap of key events or target groups (dissemination) • First building delivery : September 2009 - lyon • Identification of people responsible

  24. Contact Rodrigo Vásquez T. rvasquez@unizar.es