150 likes | 362 Views
Networks Integration Management Office Mission Support Process Networks Integration Management Office; Code 450.1. April 5, 2007. Network Integration Management Office Functions. NETWORKS INTEGRATION MANAGEMENT OFFICE.
E N D
Networks Integration Management OfficeMission Support ProcessNetworks Integration Management Office; Code 450.1 April 5, 2007
Network Integration Management Office Functions NETWORKS INTEGRATION MANAGEMENT OFFICE The Network Integration Management Office(NIMO)providesits spacecraft and scientificcustomers witha complement ofmission services. The group provides best value trackinganddata acquisition options,assistance with mission-unique communications requirements, andassistance inrequirements definition. The NIMO providesPrincipal Investigators and Mission Formulation Managers withoptions andplanningassistance toeffectively meet themissiontracking and data acquisition (T&DA)needs. The NIMO also supports the mission throughout the life cycle for its T&DA needs - from trade studies and cost analysis during the formulation phase, to project management during development and operations. In addition, the NIMO provides Network Integration Managers (NIM) with the ability to secure contract vehicles and services to implement and operate their mission most effectively.
NIMO Personnel & Assignments NETWORKS INTEGRATION MANAGEMENT OFFICE Direct Civil Servants Leslie Ambrose – Space Science Mark Ambrose – Agreements & Reimbursable Manager Jim Bangerter – Human Space Flight Evette Brown-Conwell – ELV Dick Harris – Contracts Al Levine – Loading & Feasibility Lynn Myers – Earth Sciences Tammy Wang – Resource Analyst Matrixed Civil Servants John Weiss – Estimation Dick Nefzger – Video YY Bae – Compatibility Chris Schwartz – L&F & ELV
Networks Integration Manager (NIM) Assignments NETWORKS INTEGRATION MANAGEMENT OFFICE
Proposal Teams Projects Telephone E-mail Walk in NIMO NIMO Access Methods NETWORKS INTEGRATION MANAGEMENT OFFICE
External Interface to the Infrastructure NETWORKS INTEGRATION MANAGEMENT OFFICE NASA GSFC NASA Non-NASA ESCD NIMO Lunar Network Ground Network Flight Dyn. Fac. Space Network NISN Deep Space Net
NIMO Major Process Steps NETWORKS INTEGRATION MANAGEMENT OFFICE
NIMO Major Process Steps Details - Example NETWORKS INTEGRATION MANAGEMENT OFFICE
NIMO Mission Process Products NETWORKS INTEGRATION MANAGEMENT OFFICE Memorandum of Agreement Visibility and Loading Analysis - 1 Project Support Level Agreement Visibility and Loading Analysis - 2 Networks Requirements Document Networks Requirements Review Radio Frequency ICD Compatibility Test Plan Test Quick Look Report Final Report Compat. Test Review Customer Integration Test Plan Testing Network Operations Support Plan Customer Data Flows & Simulations Visibility and Loading Analysis - 3 Mission Operations Readiness Review Mission Operations Post Launch Report/Lessons Learned The NIMO mission development process exists, and is constructed, to assure, to the maximum extent possible, communications connectivity and data delivery to every mission on every contact.
NIMO Process Timeline NETWORKS INTEGRATION MANAGEMENT OFFICE
NIMO Process Flow (cont.) NETWORKS INTEGRATION MANAGEMENT OFFICE
NIMO Process Flow (cont.) NETWORKS INTEGRATION MANAGEMENT OFFICE
NIMO PSLA Contents (Present) NETWORKS INTEGRATION MANAGEMENT OFFICE Section A. Customer Information Section B. Customer Requirements and Standard Services B.1 GSFC Networks/Data Services B.1.1 Ground Network Services B.1.1.1 Customer Requirements B.1.1.2 Services Provided B.1.2 Space Network (SN) Services B.1.2.1 Customer Requirements B.1.2.2 SN Data Formatting and Interface B.1.2.3 Services Provided B.1.3 Customer Integration and Test B.1.4 Satellite Laser Ranging (SLR) Services B.1.5 Radio Frequency (RF) Interface Control Document (ICD) B.2 Deep Space Network (DSN) Services B.3 Flight Dynamics Services B.3.1 Customer Requirements B.3.2 Services Provided B.4 Range Services – Not Applicable B.5 NASA Integrated Services Network (NISN) Services Section C. Unique Customer Requirements for Non-Standard Services Section D. Service and Schedule Summary D.1 Funding Responsibility D.2 Estimated Services for Future Years Section E. Projected Documentation Set
NIMO PSLA Contents (Future) NETWORKS INTEGRATION MANAGEMENT OFFICE SECTION A. Customer Information SECTION B. Customer Requirements And Standard Services B.1 GSFC Networks/Data Services B.1.1 Ground Network Services B.1.2 Space Network Services B.1.3 Customer Integration And Test B.1.4 Satellite Laser Ranging (SLR) Services B.1.5 Radio Frequency (RF) Interface Control Document (ICD) B.2 Deep Space Network (DSN) Services B.3 Flight Dynamics Services B.4 Range Services B.5 NASA Integrated Services Network (NISN) Services SECTION C. Unique Customer Requirements For Non-Standard Services C.1 AFSCN Requirements SECTION D. Service And Schedule Summary D.1 Funding Responsibility D.2 Estimated Services For Future Years D.2.1 Project Schedule SECTION E. Network Integration Documentation Set