1 / 9

Master Program Railroad Protective Liability

Master Program Railroad Protective Liability. David C. Pitcher, ARM-P Claims and Insurance Manager UTA. Stephen A. Benigno Insurance and Risk Control Program Manager SEPTA. What is Railroad Protective Liability Insurance (RRPLI)?. Who is covered? What is covered? When is RRPLI needed?

amina
Download Presentation

Master Program Railroad Protective Liability

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Master ProgramRailroad Protective Liability David C. Pitcher, ARM-P Claims and Insurance Manager UTA Stephen A. Benigno Insurance and Risk Control Program Manager SEPTA

  2. What is Railroad Protective Liability Insurance (RRPLI)? • Who is covered? • What is covered? • When is RRPLI needed? • Why do Railroads require this coverage?

  3. What is Railroad Protective Liability Insurance (RRPLI)? • What are standard limits available for RRPLI? • Where can RRPLI be obtained? • What information is generally needed to get an RRPLI quote?

  4. History and Program Design In 1982, SEPTA assumed operating responsibility for our Regional Railroad Passenger Operations. SEPTA’s RRPLI is designed around SEPTA, Amtrak, and CSX Operating agreements.

  5. Program Underwriting • Construction Projects; poles, new station, bridge work, tunneling. • Maintenance Programs • Market vs. Flat Renewal • Limits

  6. Program Administration • Complete RRPLI spreadsheets • Quote Sheets • Broker Recommendation • Author Executive Staff Summary • Board Resolution • Board Presentation • Board Vote • Bind Insurance • Pay Invoice • Claims Management

  7. UTA Blanket RRPLI Program • Risk History • UTA and Rail • Interaction with other railroads • Construction/Post construction Risks • Program Design • Model: Union Pacific • Program Setup • Discussions with Broker • Reviewed and approved proposed program • Procurement

  8. UTA Blanket RRPLI Program • Administration • Criteria (ROE vs Permit) • Application • Enrollment • Reporting • Quarterly report • Claims • Reported to the carrier • UTA conducts independent investigation • Federal/State requirement • Internal

  9. Questions?

More Related