1 / 6

CNIC UPDATE

CNIC UPDATE. Mr. Jim McDonner CNIC Program Manager 27 JULY 2011. CLASSIFICATION. UNCLASSIFIED. Regional Alignment. Since 2004 PSDs have been aligned under PSAs and then NPPSC.

amir-clark
Download Presentation

CNIC UPDATE

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CNIC UPDATE Mr. Jim McDonner CNIC Program Manager 27 JULY 2011 CLASSIFICATION UNCLASSIFIED 1

  2. Regional Alignment • Since 2004 PSDs have been aligned under PSAs and then NPPSC. • Other CNIC product lines have policy at HQ, oversight of operations at Regions, and day to day tactical operations at Installations. • Regional alignment is consistent with CNIC business model, streamlines command alignment, provides improved operational framework for service delivery and enhances customer service. • HQ N14: Monitor metrics, execute budget, develop POM submission, execute fiscal and disbursing operations, standardize processes, execute QIV/inspections/training, liaise with partners on systems development, and coordinate Navy policy with stakeholders. Oversight and management of ICAT 21 remains with HQ N14. • Region N1/N14/COs: Provide day to day oversight and management of PSDs and local Sailor support including urinalysis program, GMT, DAPA, CACO, PRT, CCC, and NJP.

  3. Staffing Standard Assumptions • Workload was gathered from the A-76 study and FY-10 transaction statistics from DFAS (pay), and NPC/NSIPS (personnel). • Workload includes pay, personnel and transportation transactions and customer service intangibles not resulting in counted metrics. • Inherently governmental workload assessment performed by SMRD team with results included in staffing standard. • A-76 study did not include overseas detachments so workload included a comprehensive review of each overseas detachment and unique requirements peculiar to certain PSDs (i.e. cash cages, etc). • PSD/CSD Cutoff • PSD: 23 or more personnel assigned (exceptions for overseas currently staffed with OIC) • CSD: 22 or less personnel assigned • 2-person CSD (storefront operation) was listed in A-76

  4. Staffing Standard Assumptions (Cont’d) • Standardized civilian positions • Directors (GS-13) – only at PSDs • Assistant Director (GS-12) – only at PSDs with at least 70 personnel assigned (exception is PSD Washington based on significant senior customer base) • Transportation Officer (GS-12) • PERSO/DDO (GS-9) • All detachments have a PERSO and DDO assigned • Assistant Transportation Officer (GS-9) • Pay/Pers Supervisors/ESO (GS-7) • 0-9 Personnel Assigned 0 Supervisors (supervised by PERSO/DDO) • 10-20 Personnel Assigned 1 Supervisor • 21-39 Personnel Assigned 2 Supervisors • 40-49 Personnel Assigned 3 Supervisors • 50-59 Personnel Assigned 4 Supervisors • Auditors (GS-6) • 1 Auditor per 25,000 pay transactions (minimum of 15,000) • Transportation Agents (GS-6) • Pay/Pers/Admin Clerks (GS-5)

  5. Labor Impact on Performance (PBIS Issue 66223) Gap CTR GS BA ICA ME 11/18/2014 9:00 PM 5

  6. Timeliness By User Category

More Related