1 / 9

Demand Estimation

Demand Estimation. Specifying a Demand Equation General Form: Q = F(P, M, P R ,T, P e , N) Empirical (Regression) Form: Q = a + bP + cM + dP R + eN You estimated a demand equation like this in the demand project. The Identification Problem. Estimate Q = a + bP + cM + dP R + eN

amy
Download Presentation

Demand Estimation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Demand Estimation • Specifying a Demand Equation • General Form: • Q = F(P, M, PR,T, Pe, N) • Empirical (Regression) Form: • Q = a + bP + cM + dPR + eN • You estimated a demand equation like this in the demand project

  2. The Identification Problem • Estimate Q = a + bP + cM + dPR + eN • If P and Q are determined by supply and demand, how do you know that you are estimating a demand relationship? • Answer: You don’t! • If you have not estimated a demand relationship, you have an identification problem. • Warning signs: • Coefficient on price (b) is positive • Coefficient on price (b) is not statistically significant

  3. Solution to Identification Problem • Use a technique called 2-stage Least Squares • Specify Demand and Supply Equations • Qd = a + bP + cM + dPR + eN • Qs = f + gP +hPI • Run a 2-stage least squares program • When is Identification not a problem? • Data are for a single firm setting it’s own price • Price not set by market (regulated prices) • Electricity prices are regulated by the states • Identification not a problem for demand project

  4. Calculating Elasticities for estimated demand equations • Linear equation – demand project • Q = a + bP + cM + dPR + eN • E = b(P/Q) = (ΔQ/ΔP)(P/Q) • EM = c(M/Q); EPR = d(PR/Q) • Log-linear equation – constant elasticity • Ln(Q) = g + h(lnP) + j(lnM) + k(lnPR) • Coefficients (h, j, k) are elasticities • No calculation needed

  5. Calculate elasticities at the sample means • Milkwh= 10800 – 3581(Pkwh) + 0.004(Pop) + 2252(PGas) • Elasticity = (coeff.)(value/Milkwh) • Sample Means: Milkwh=25365 Pkwh=9.0 Pop=5,756,577 PGas=11.4 • E = -3581(9.0/25365) = -1.27 • Epop = 0.004(5,756,577/25365) = 0.91 • Epgas= 2252(11.4/25365) = 1.01

  6. Exercise: Elasticities • Milkwh= 10800 – 3581(Pkwh) + 0.004(Pop) + 2252(PGas) • Milkwh=38,526 Pkwh=6.92 Pgas=10.6 Pop=5,900,962 • Elasticity = (coeff.)(value/Milkwh) • Calculate electricity demand elasticities with respect to Pkwh, Pop, & Pgas • Ep = -0.643; Epop = 0.613; EPg = 0.62

  7. Forecasting Demand • Using Elasticities • Multiply elasticities by projected % changes in explanatory variables • Add the results to get projected % change in demand • Using linear regression equation • Multiply coefficients by projected values for explanatory variables in future period • Add results and intercept to get forecast of demand

  8. Forecasting with elasticities • Estimate a log-linear equation • LMilkwh = 0.04 – 0.92(LPkwh) + 1.0(LPop) + 0.4(LPgas) – 0.4(Linc) • Get projected % changes • Pkwh:10% Pop:1% Pgas:20% Inc:2% • Calculate the projected % change in Milkwh • -0.92(10%)+1.0(1%)+0.4(20%)-0.4(2%) = -1% • Do not use the intercept!It doesn’t change. • Suppose Pgas goes down by 20%, not up? • -0.92(10%)+1.0(1%)+0.4(-20%)-0.4(2%) = -17%

  9. Exercise: Forecasting with linear demand • Estimate a linear demand equation • Milkwh= 10800 – 3581(Pkwh) + 0.004(Pop) + 2252(PGas) • Get forecasts of explanatory variables • Pkwh=10 Pop=20,000,000 Pgas=10 • Calculate a Forecast for Milkwh • Milkwh=10800 – 3581(10) + 0.004(20,000,000) + 2252(10) • = 77,510 • Here the intercept is included in the calculation.

More Related