An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 45,000 40,000 35,000 30,000 25,000 20,000 15,000 Vanderbilt Energy: 18,708,842 Kilowatt Hours

  2. Lighting Retrofit: “the low hanging fruit” T-8 T-12

  3. KWH 7% General Library: Energy Conservation Efforts: Lighting Retrofit & Control Replacement of Rooftop Units BAS Upgrade

  4. Tennis Center:

  5. KWH 46% fc Tennis Center:

  6. Student Recreation: Reduced lighting energy 71.8% from: 28,000 watts to 7,896 watts Before After

  7. KWH 15% Jacobs / Featheringill Energy Conservation Efforts: BAS-night setback implementation BAS-variable air volume tuning

  8. KWH 26% Buttrick Hall: Energy Conservation Efforts: BAS-night setback implementation BAS-variable air volume tuning

  9. KWH 30% OGSM: Energy Conservation Efforts: BAS-addition of DDC controls to the main HVAC infrastructure Addition of variable speed drives to the AHU motors Lighting Retrofit

  10. 3 RPM2 BHP2 = RPM1 BHP1 100% On during the day 60% Variable Frequency Drive Night Setback OFF = 100% Energy Savings 40 HP reduced <10 HP Off after hours

  11. High Efficiency Equipment “Maglev” Bearings

  12. Other Project Buildings: KWH Energy Conservation Efforts: Lighting Retrofit & Control VFD Installations Chiller Replacement BAS Upgrade

  13. Annual Energy Consumption Trend 15 Project Buildings Combined KWH