1 / 6

All Experimenters’ Meeting August 22, 2011

All Experimenters’ Meeting August 22, 2011. Power Curtailment 2011. Objective: Reduce power to 43.5 MW for a duration of 1 hour i n 90 minutes or less while promoting a quick recovery. Turn off Main Injector,Booster , Switchyard, NuMI , MiniBooNE & beamlines .

andie
Download Presentation

All Experimenters’ Meeting August 22, 2011

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. All Experimenters’ MeetingAugust 22, 2011

  2. Power Curtailment 2011 Objective: Reduce power to 43.5 MW for a duration of 1 hour in 90 minutes or less while promoting a quick recovery • Turn off Main Injector,Booster, Switchyard, NuMI, MiniBooNE & beamlines. • Turn off PBar after transferring stack to Recycler. • (This will be done as late as possible) • CHL : turn off the Nitrogen Plant. • The Tevatron Store will remain circulating. • The Recycler Stash will remain circulating. • No New Bakes or large power loads added • IB-1, IB-4, NML, MP9, or other areas.

More Related