All Experimenters’ Meeting August 22, 2011. Power Curtailment 2011. Objective: Reduce power to 43.5 MW for a duration of 1 hour i n 90 minutes or less while promoting a quick recovery. Turn off Main Injector,Booster , Switchyard, NuMI , MiniBooNE & beamlines .
E N D
Power Curtailment 2011 Objective: Reduce power to 43.5 MW for a duration of 1 hour in 90 minutes or less while promoting a quick recovery • Turn off Main Injector,Booster, Switchyard, NuMI, MiniBooNE & beamlines. • Turn off PBar after transferring stack to Recycler. • (This will be done as late as possible) • CHL : turn off the Nitrogen Plant. • The Tevatron Store will remain circulating. • The Recycler Stash will remain circulating. • No New Bakes or large power loads added • IB-1, IB-4, NML, MP9, or other areas.