Education Maximo Users Group - San Antonio, TX Mike Stasiewicz Senior IT Specialist – IBM Maximo

Education Maximo Users Group - San Antonio, TX Mike Stasiewicz Senior IT Specialist – IBM Maximo. December 16, 2008. Agenda. Overview of Migration Manager Work Management Enhancements Overview IBM Maximo Linear Asset Manager 7.1 Security Reporting. Migration Manager Overview.

andren
Download Presentation

Education Maximo Users Group - San Antonio, TX Mike Stasiewicz Senior IT Specialist – IBM Maximo

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Education Maximo Users Group - San Antonio, TXMike StasiewiczSenior IT Specialist – IBM Maximo December 16, 2008

  2. Agenda • Overview of Migration Manager • Work Management Enhancements Overview • IBM Maximo Linear Asset Manager 7.1 • Security • Reporting

  3. Migration Manager Overview

  4. Content is migrated in packages • Package • Package is a container for product configuration content • Package has a life-cycle; package is: • Defined • Created • Distributed • Deployed Source Maximo instance Target Maximo instance Define Create Distribute Deploy

  5. XML XML XML XML XML XML XML XML XML XML XML XML XML XML XML XML XML XML XML XML XML XML XML XML XML XML XML XML XML XML XML XML XML XML XML XML XML XML XML XML XML XML XML XML XML ZIP ZIP ZIP ZIP ZIP ZIP ZIP ZIP ZIP ZIP Redistribution Example Production Server 2 Production Server 3 Production Server 1 PROD DB PROD DB PROD DB 1 Configurations created and updated as needed 3 Redistribute from test to production Redistribute to migrate ‘golden’ packages to production 2 Testing proceeds until exit criteria met Distribute to test Iterative create/distribute/test Test Server Development Server DEV DB TEST DB

  6. Work Management Enhancements Overview IBM Confidential

  7. Move/Swap/Modify Action • The Move/Modify Asset action is being enhanced in a number of ways. The action will now be called Move/Swap/Modify • A true ‘Swap’ option is now offered where an asset can be swapped out for a replacement

  8. Automated Process Flow for Work Orders • Embedded work flow process in Job Plans and Work Orders • Automatically ‘start’ new records when all predecessors are completed • Automatically complete work orders when all tasks have been completed • Do not allow inheritance of start and complete status changes • Optionally turn on this feature or not

  9. View Work Detail Action • The existing View WO & PM action is being enhanced. It will now be called View Work Details. • This action will now display both Work Orders and Tickets in a single work view. • All classes of records will be displayed and identified • The old View Tickets action will be replaced by this new action

  10. New Activities & Tasks Application • The existing Activities application will be replaced by a new ‘Activities & Tasks’ application • Designed to farm work out to laborers/technicians • Similar to Quick Reporting • Designed for executing single Tasks or Activities • Not designed for hierarchies • Not designed for planning • Screens have been pared down for ease of use

  11. Attached Documents on Work Tasks and Job Tasks • Job Plan Tasks and Work Plan Tasks will need to support attached documents • Paper Clip icons and standard Attached Doc functionality will be added to the Job Plan Tasks and Work Order Tasks • Attachments on Job Plan Tasks will be copied to the subsequent Work Order Tasks.

  12. Nested Job Plans • Nested Job Plans allow Work Order hierarchies to be created • If a Job Plan Task has a Nested Job Plan defined, it will create a child work order instead of a task

  13. Allow All Item Types on Job Plans • Items can be associated with Job Plans to determine what work will be required if an item is purchased. • The change allows ALL types of items to be associated – Service, Tool, Material.

  14. New Job Plan Template Type Field • A new field will be added called Template Type • Valid Values: • MAINTENANCE – Traditional Job Plans • ACTIVITY – Activity Template • PROCESS – Process Template

  15. IBM Maximo Linear Asset Manager 7.1

  16. Trails Rails Roads Pipelines Linear 101 • A linear asset covers a distance, and that distance directly impacts the maintenance of the asset.

  17. Security Overview and Enhancements Summary

  18. Enhanced Flexibility • Increased Ease of Use/Administration • Maximo Authentication • LDAP Integration

  19. Ability to conditionally set security on individual data elements per group • Only fetch asset records from the database when the type is IT • Create a condition • Create a Data Restriction

  20. Data Restrictions (Row and Attribute Security) • Set conditions for access everywhere an object or attribute is used • Hidden, read-only, required, qualified • Globally or per security group

  21. Signature Option on a Control • Application Designer • Add/Modify Signature Options • Control Properties Dialog • Tie the Control to a SIGOPTION to set on/off access

  22. Application Designer – Signature Options

  23. LDAP Integration • Enhanced standard integration with external directories (LDAP) including ITDS

  24. V7 Reporting

  25. Reporting Roadmap future 2001 2005 2008

  26. Why Are We Changing Reporting Tools? 1. Eliminate Complex Installs 2. Eliminate Platform Support Dependency Issues • Database/ Web Servers / Appservers / Adobe Reader Enables Focus on Reporting Functionality

  27. 3. Deliver 150+ OOB Reports Configurability

  28. 2. Report Scheduling Benefit: Offload Processing to Non-Peak Hours PLUS User Managed Scheduling At Single Time in Future OR Recurring Performance

  29. Thank you! Questions?