An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Innovative Finance & Delivery in Ohio Mike Wawszkiewicz P3 Project Manager

  2. $1.6 Billion – Over Budgeted Construction • $10 Billion – Projects in Development OHIO NEEDS: ODOT needs to get creative & be innovative to begin to fill the gap

  3. Helping Meet the Needs X Y S Z R V I T V G S O Q J H E G X F PUB M M F T K L R L B S H J E KAI FL P F S E L E G I S L A T I O N FZ QR J BKI P E K I M K Z X K M R I Z S P H JT U Y HVC H I V E X V X E L W A B B O E U N L I C G E C F B M N V Z Q E E M Q N L X N E W N O T K C I D G S N O R C J K D E I M PRIVA O P P Y L U P R Q C H Z A L B CG N S N I J Y K O Q G S J Z K A G Z E Z Z Y C T H V M T G I L E O R G A N I Z A T I O N O F I G C A T R C O I O P F K X H Y O M P S W P X L W N P Y P N D K E D L K E W W XO G S G V P D U D X L T K B Y U L M W K Y P Q E S A N O Q J R X L M P Y L Q W X W W S F E M S X P I M P L E M E N T A T I O N C E I R B C F J V Y Y H G L X J R C H L K I X A X H Q Z M V J O Q B L Y L H V L C P V O E M C R J U D U G R L T A N H W N P M G Y Y L Q J OK

  4. P3 LegislationORC 5501.70-5501.83 Allows ODOT to deliver P3 projects • Allows ODOT to solicit, receive, consider, evaluate, and accept bids and proposals for P3 projects. • A P3 may cover any aspect of a transportation facility, from development, to construction, to operation of the facility. • Provides for flexibility in surety requirements. • Allows for multi-party agreements which may include political subdivisions. • Establishes both required and permissive elements for a public-private agreement including assessment of user fees.

  5. ODOT P3 Policy • Provides for consistent, transparent and efficient framework for procurement. • Identifies payment types and position in ODOT debt waterfall. • Sets forth available delivery mechanisms. • Provides process for solicited and unsolicited proposals. • Allows for payment of proposal development fee or stipend. • Identifies the Division of Innovative Delivery as the division with primary responsibility for implementation. • Posted on ODOT Division of Innovative Delivery Website: http://www.dot.state.oh.us/Divisions/InnovativeDelivery

  6. DID Organization Director Jerry Wray a Steering Committee Assistant Directors Chief of Staff Assistant Director Greg Murphy Deputy Director Jim Riley Consultant Contracts TFAC - HNTB/E&Y TFAC – PFM/HMM Turnpike – KPMG/PB/A&O Portsmouth – CH2/E&Y BSB – HNTB/KPMG Working Groups/IDTTs Construction, Communication, Planning, Engineering, Finance, Maintenance, District Representatives, Chief Legal Julie Brogan Mike Wawszkiewicz Adam Sheets Tim Biggam

  7. Standard Operating Procedures • Availability payment transactions. • P3 Capital Project Delivery Roles and Responsibilities. • P3 Policy Board - comprised of the Director and Assistant Directors; will have final authority on all P3 issues. • Divisional Approval Committee (DAC) - comprised of Division and District Deputy Directors; makes recommendations on P3 policy • Project Screening Working Group (PSWG) - Conducts high level screening of all projects and a detailed screening of projects which advanced beyond the high level screening. • Contract Document Working Group (CDWG) - Controls the development of Model/Programmatic Contract Documents • Innovative Delivery Transactional Team (IDTT) - Led by a Division Innovative Delivery Project Manager; comprised of CO/District staff with clearly defined responsibilities to deliver a P3 capital project

  8. P3 Policy Board • Director & Assistant Directors Division Approval Committee (DAC) • DD of Innovative Delivery • Chair • DD of Engineering • Permanent • DD of Planning • Permanent • DD of Construction • Permanent • DD of Finance • Permanent • Chief Legal Counsel • Permanent • DD of District 12 • Rotating • DD of District 8 • Rotating • Project Screening Working Group (PSWG) • Mike Wawskiewicz Contract Document Working Group(CDWG) Adam Sheets • Innovative Deliver Transaction Team(IDTT) • IDTTPortsmouth Bypass • IDTTBrent Spence Bridge • IDTTCleveland InnerbeltBridge • IDTTTurnpike

  9. Innovative Delivery Transaction Team(IDTT) • IDTTPortsmouth Bypass(PSB) • IDTTBrent Spence Bridge(BSB) • IDTTCleveland Innerbelt Bridge (CIB2) • IDTTTurnpike(TP)

  10. Implementation • Screening • Costs • O&M Potential • Priority Project • Ripe (Project Status) • Sufficient time and staff • Prioritization • Value for Money • Procurement

  11. Innovative Delivery – P3 Projects • Turnpike - Study Completed • InnerbeltBridge Contract Group 2 - Procurement Documents Being Developed • Portsmouth Bypass - Value for Money Analysis in Progress (completion in January 2013) • Brent Spence Bridge - Value for Money Analysis in Progress

  12. Turnpike Consultant Team • Studied Leveraging • Do Nothing • Governance – ODOT Control • Full Concession • Everything in Between • Evaluated best Public option vs. Public-Private option • Current Tolling Policy • Over the past 20 years, Turnpike toll rates increased > inflation • The Turnpike still has one of the lowest toll rates among comparable roads • Tolls were last increased in January 2012. • Analysis Considered • Public-Private Option: Toll increase cap of inflation, or increase in CPI, estimated at 2.7% • Public Option: Toll increase cap of inflation based on bond covenants for at least 10 years • Future toll increases - follow the tolling policy in OTC’s Master Trust Agreement • Local E-ZPass Freeze – for local auto trips < 30 miles

  13. Cleveland Innerbelt – Construction Contract Group 2 DBFDemolition and Eastbound Bridge • 1.5 Miles of Roadway Improvements • 70,000+ Vehicles per Day • Design-Build-Finance (DBF) • Accelerate start of construction by over 2 years with negligible cost difference • Efficiencies in combining Demolition and Construction Contracts • Shorten duration of bi-directional traffic on single bridge (2-lane EB/4-lane WB) • Roadway User Cost Savings of over $25 Million

  14. Scioto County SR-823 “Portsmouth Bypass” • Availability Payment Model • Guaranteed fixed price for construction and O&M • Accelerate Completion By 8 Yrs • TIFIA Application Submitted • VfM Analysis – Completion in January 2013 • 16 mile Greenfield • 19,800 vpd • DBFOM • Combine with paving

  15. Brent Spence Bridge (I-71/I-75 Improvements) • ~$2.5B ODOT-KYTC Project • Approximately 8 miles of roadway improvements • Current: 160,000 vpd(11% Trucks) • 2035: 235,000 vpd • FONSI Approved - July 2012 • Value for Money Analysis – Early 2013 • Tolling Analysis – Early 2013 • Potential DBFOM with Tolling/Availability Payment • TIFIA LOI to be submitted in 2013

  16. Study Area • Study area 3.21 sq. miles • Project length 7.8 Miles • 5.1 miles (26,807 ft) in KY • 2.7 miles (14,256 ft) in OH • Existing bridge length • 1,736.5 feet • 4% of project length • ~$2.5B ODOT-KYTC Project

  17. Building the Brent Spence Bridge Corridor Steps To Building Our Bridge 2015

  18. Questions? Mike Wawszkiewicz Phone # 614.728.4585 michael.wawszkiewicz@dot.state.oh.us Jim Riley Phone # 614.387.5183 jim.riley@dot.state.oh.us