BIM in Project Management: Maximizing Efficiency and Accuracy

Explore the use of Building Information Modeling (BIM) in project management, its benefits, levels, and tools. Discover how BIM can improve project cost analysis, preventative maintenance scheduling, asset management, and more.

Download Presentation

BIM in Project Management: Maximizing Efficiency and Accuracy

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. To dream a while : https://vimeo.com/64543487

  2. Sommaire • Current project design and management • What does BIM mean ? • BIM for what ? • BIM or 3D model ? • BIMis a « PROCESS » • The different levels of BIM • Tools and formats • Viewers

  3. Current project management, which consequences ????

  4. Current project management Here is the today's technical working data flow of a building management

  5. BIM management

  6. What does BIM mean ? BIM, three definitions exist. The « B » (Building) and the « I » (Information) are not ambiguous. The « M » of the acronym may mean as the case may be : MODEL, MODELING, MANAGEMENT. This ambiguity is not a problem because the M means the three.

  7. Building Information MODEL Modeling MODELING MANAGEMENT Building Information MODEL Modeling MODELING MANAGEMENT BIM BIM Protocol Object (ex: foundation) Building Information MODEL A Building Information Model is ... the output of the business process resulting in a digital prototype, a virtual computer model of a project which holds selected structured data about the asset (design, quantity, physical and thermical properties, time, cost, as-built, etc).

  8. MODELING Organisations Building Information Modelling is … a business process for generating and leveraging building data to design, construct and operate the building during its lifecycle. NB: not just buildings, infrastructure, etc too

  9. Advantages Concurrent Engineering provides benefits such as reduced product development time, reduced design rework, reduced product development cost and improved communications. Examples from companies using Concurrent Engineering techniques show significant increases in overall quality, 30-40% reduction in project times and costs, and 60-80% reductions in design changes after release.

  10. MANAGEMENT Process Building Information Management is ... the organisation and control of the business process using the digital prototype to effect the sharing of information over the entire lifecycle of an asset. (NB: whole life approach)

  11. RÉGULATION : In many countries the use of BIM standard software will be a legal obligation for all public projects ( 2017 in EU) and, almost certainly, for all big projects. BIM is not a unique software but a new standard of design and communication between different parties.

  12. WHY THE BIM ? FACILITIES AND MANAGEMENT The BIM model is archived as a resource. From here the performance of the complete structure can be tested and the model be utilised for facilities management. This will create better performing more energy efficient buildings and the improvements for facilities management contribute by enabling the building to be better operated.

  13. PROJECT LIFE CYCLE Project Management

  14. BIM process consequences analysis about the project costs

  15. Preventative Maintenance Scheduling - Tracking and maintaining lifecycle information about the building structure (wall, floors, roof, etc.) as well as the equipment serving the building (mechanical, electrical, plumbing, etc.) to plan and schedule a program of maintenance activities that will improve building performance, reduce repairs, and reduce overall maintenance costs.Gestion du patrimoine, pilotage et maintenance des équipements. Asset Management - Linking data in a BIM record model to a database of building assets to assist in efficiently maintaining and operating the facility. These assets often include the building elements, systems, and equipment that must be maintained and operated efficiently to satisfy the facility users’ requirements in a cost effective way.

  16. BIM is not ... BIM is not … new … just an IT "Information Technology" issue... or just software … 3D … something designers do … just about project delivery … a short-lived fad … irrelevant to small projects … “the silver bullet” or “Holy Grail” … optional? Modèle 3D de la Fondation Louis Vuitton

  17. I of BIM = information, the main point in the process. Previously 'documents' such as drawings, schedules and specifications were written, now this information is being digitally generated from well-structured information models. We are starting to see a construction industry in which digital information flows from inception through to demolition, making big efficiency and accuracy savings along the way.!

  18. BIM LEVELS There are 3 criterias to know for which BIM process we talk about. 1) The use level : 2D visualisation of the 3D on a plan 6D + Sustainibility 3D Basic geometrical representation 7D + Facility management applications. 4D + Scheduling 5D + Estimating XD The next ones : comfort ? Security ?

  19. BIM LEVELS 1) The use level : detailed

  20. 2) Level of development LOD

  21. 2) Level of development LOD Below is graphic representation of the concept. As the LOD increases we get more information about the beam, although graphically that may not indicate a huge jump such as between LOD 200 and 300.

  22. 2) Level of detail LOD Too ! Level of Detail refers to the amount of information provided. With level of detail, it is assumed that all the provided information is relevant to the project and can be relied upon with certainty.

  23. 3) BIM MATURITY LEVEL

  24. Mandates Information for all phases

  25. INTEROPERABILITY

  26. To the Interopability... ● Analyse and identify the needs : - Who ? (The Actors) and What (The Exchanges) ● Deduce that a Protocol : - BIM Protocol ● Provide our selves with the means - How ? → Tools and Formats

  27. BIM Manager • Receive and manage multiple subcontractor models. • Coordinate all BIM Logistics (Contracts, Emails, File sharing, etc.) • Create, maintain and analyze federated model mainly for coordination purposes. • Review and document design document and coordination conflicts. • Run and analyze clash detection on federated model. • Prepare and distribute clash reports to facilitate the coordination process. • Schedule and facilitate coordination meetings along with project manager and/or • superintendent. • Write Meeting Minutes. • Site inspection and liaising with trade contractors • Meet with designers/owners as required to facilitate review of models as needed. • Compile contract BIM close out documentation

  28. BIM Manager : Is it a great job opportunity ?YES, It is BUT, In few years this job will not exist ! WHY ????Do you know currently jobs called : Email Manager, or Internet Manager ?

  29. IFC (Industry Foundation Classes) What is IFC and what do you need to know about it? IFC is a global standard for data exchange in the building industries. IFC is both a common data model and an open file format. Building industry professionals can use IFC to share data regardless of what software application they use to get their job done. Similarly data from one phase of the building lifecycle can be utilised in a later stage without the need for data re entry, custom import interfaces or proprietary plugins. EXPORT IMPORT IFC IFC IFC IFC IFC IFC

  30. IFC (Industry Foundation Classes)

  31. THE TOOLS : 1) Softwares : 1-1) Modelling 1-2) Fields Analysis 1-3) Overview (visuaisation) 1-4) Collaboration (platform) 1-5) Management, Operating

  32. Design Modelling : Energy, Lighting, Acoustic, Costs… Industry softwares. ClimaWin : Energy Archiwizard Elodie (Environment) Dialux (Lighting) DEVISOC (Costs)

  33. 2) The formats: 2-1) Exchange Formats : • IFC • gbxml 2-2) Delivering Formats : • COBie • .xls • .xlsx • .csv 2-3) Annotations Format : • BCF

  34. The modell may be realised from BIM objects provided by the manufacturers thanks to parametric objects. You can find them on the industrials website or in libraries (BIMobject, BIM Components, Polantis ….): ALKERN SIPLAST VELUX And Many More… LA TOULOUSAINE

  35. Pour en savoir plus http://eduscol.education.fr/sti/seminaires/le-numerique-dans-les-formations-du-secteur-du-batiment-et-travaux-publics-btp Fédération française du bâtiment : www.batiportail.com/toutsurlebim.asp Association BuildingSmart : www.buildingsmart.org Association Mediaconstru http://www.mediaconstruct.fr/ Association AIMCC  www.aimcc.org CSTB www.cstb.fr Base de données INIES : www.inies.com BOUYGUES CONSTRUCTION : http://www.bimgeneration.com/ Village BIM http://villagebim.typepad.com/ Malette BIM http://portail_sbtp_pro.ac-toulouse.fr/web/190-mallette-pedagogique-bim.php Les familles (famille REVIT RFA) téléchargement d’objets http://la-boutique-du-bim.blogspot.fr http://www.polantis.info/le-bim-pour-les-nuls/