Build 3b Testing

This document provides an overview of the progress made in Build 3b testing, including the testing of incremental builds, regression testing, and the posting of artifacts. It also outlines the schedule for future testing activities.

Download Presentation

Build 3b Testing

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Build 3b Testing PDS Management Council Face-to-Face Columbia, MD April 2-3 , 2013 Emily Law

  2. Topics • Progress To Date • Build 3b • Artifacts • Schedule • Backup Build 3b Testing

  3. Progress To Date • Performed System testing using example bundles • Conducted for all incremental builds • Tested regression over time • Supported by EN test staff • Posted test documents, release description, deliverables on EN build pages • Recorded anomalies, issues and metrics Build 3b Testing

  4. System • Completed testing of incremental builds • 1a, 1c, 1d, 2a, 2b, 2c, 3a • Focused on EN infrastructure • Preparation, Ingestion Tools • Catalog Migration, Registry, Security, Report • Search • Artifacts posted on EN build deliverables pages • Software, Release Description, Design Specs • Test Docs, Results/RFAs Build 3b Testing

  5. Operations To Date • Operational capabilities deployed • Registry and Harvest infrastructure in place at EN • Central catalog migrated to registry; High level search migrated • Information model released for limited use to select data providers • PDS3 data now being ingested into PDS4 system at EN Build 3b Testing

  6. Build 3b Testing • Perform regression tests using example bundles and data products • Validate against requirements • Post artifacts on Build 3b Deliverables EN page • http://pds-engineering.jpl.nasa.gov/index.cfm?pid=145&cid=187 • Standards and Documents • Software and Documents • Test Plan & Procedures Build 3b Testing

  7. Schedule • April 2013 • Regression testing to verify software against PDS4 examples • Compile test report • Post on Build 3b Deliverables EN site Build 3b Testing

  8. Backup Build 3b Testing

  9. Data Standards • Reviews • 1b, 1c (IPDA), 1d (External), 2a, 2b, 2c, 3a • Focused on meeting LADEE & MAVEN needs • Data Providers Docs • Information Model, Standard Reference • Schemas, core products/objects • Beta test conducted by Atmospheres to get user input on PDS4 concepts (XML, Bundles, etc) • Artifacts posted • Information Model, Model/Standards Docs, Schemas, example products/archives • Review Docs, Reports, RFAs Build 3b Testing

  10. Definition Regression Testing • Standard procedure in building S/W system • Test predefined set of test cases including test cases run in previous builds • Ensure system (after change) work correctly without breaking previously operational functions nor introducing new anomalies Build 3b Testing

  11. Example Products Build 3b Testing