Hot Work Procedure and Permit

Hot Work Procedure and Permit. April 2013. Overview. Why is there a new hot work process? Description of hot work areas New Hot Work; work practice and permit Permit picture Permit records Where to get the permits Mine to port Any questions. Why is there a new hot work process?.

angie
Download Presentation

Hot Work Procedure and Permit

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Hot Work Procedure and Permit April 2013

  2. Overview • Why is there a new hot work process? • Description of hot work areas • New Hot Work; work practice and permit • Permit picture • Permit records • Where to get the permits • Mine to port • Any questions Presentation – PAGE 2

  3. Why is there a new hot work process? • To clearly document the requirements for completing hot work at IOC • To be consistent across Sept Iles and Labrador City operations • To improve the controls in place for hot work Presentation – PAGE 3

  4. Hot Work areas A hot work permit is required for all hot work on site that is not conducted in a designated area • Designated areas • Is a specific area designed and approved for hot work on a continual basis e.g. welding bays • Hot work permit areas • Is an area where hot work is permitted provided that they are made fire safe, a Hot Work Permit has been issued and a Job Hazard Analysis (JHA) has been completed • Prohibited areas • Is an area where there is a high potential for fire and / or explosion or where combustible hazards cannot be adequately controlled. See Hot Work procedure for additional information Presentation – PAGE 4

  5. New hot work procedure and permit • New Hot Work; work practice and permit: • Link to IOC-S-E-WP Hot Work • Key points: • A Hot Work Permit is for one specific job in one location • Hot work permit shall be posted where the hot work is being performed • Review the precautions for hot work with the person(s) performing the hot work and assigned fire watch prior to issuing the permit • Ensure the emergency response plan is in place • Ensure all fire fighting equipment is appropriate and operational Presentation – PAGE 5

  6. Permit – front page Presentation – PAGE 6

  7. Permit – back page Presentation – PAGE 7

  8. Permit Records • Permit issued by an IOC Leader • Permit is reviewed by workers doing the job • Fire watch signs off permit 60 minutes after completion of the task • All hot work permits shall be kept at the job site for the duration of the permitted task • The permit shall be available for inspection by other parties including your supervisor, safety advisor etc Presentation – PAGE 8

  9. Where to get the permit? • Hot work permits are available from your team leader • Warehouse reference numbers: • Labrador City 2423152 • Sept Iles 2338897 Presentation – PAGE 9

  10. Where to get the procedure Presentation – PAGE 10

  11. Questions Presentation – PAGE 11