A380 Wake Vortex Project

A380 Wake Vortex Project. ICAO Air Navigation Commission 18 November 2005. Objective. To recommend the wake vortex separation for A380 in respect of: Arrival Departure Vertical Horizontal In trail (climbing/descending). Background. VLTA Conference 1998

ania
Download Presentation

A380 Wake Vortex Project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. A380 Wake Vortex Project ICAO Air Navigation Commission 18 November 2005

  2. Objective • To recommend the wake vortex separation for A380 in respect of: • Arrival • Departure • Vertical • Horizontal • In trail (climbing/descending)

  3. Background • VLTA Conference 1998 • Dedicated working group led by ICAO concluded that special emphasis needed for VLTA wake vortex issues • JAA Airworthiness Division preferred Ops Division to address this issue since there were no existing certification provisions / requirements • FAA also considering wake vortex issues as encouraged by NTSB recommendation A94.056 • July 2003 JAA set up steering group, co-chaired with EUROCONTROL and participants FAA and AIRBUS, with ICAO as observer. The group reports to JAA & EUROCONTROL

  4. Over-arching principle • No prior established scientific basis for establishing separation criteria • Assumption – existing separation criteria acceptably safe • Compare – A380 vs B747 & A340

  5. Safety Assessment • To satisfy EUROCONTROL and JAA programme requirements, an independent safety case has been formulated by DNV (DET NORSKE VERITAS)under contract. • This safety case will provide evidence that wake vortex separation criteria for the A380 are acceptably safe. • Evidence will be based on: • Hazard assessment • Modeling/ Measurements • Validation of processes & methods • In-service monitoring

  6. Strategy ARRIVAL  LIDAR + transport & decay model DEPARTURE  LIDAR + transport & decay model VERTICAL  LIDAR + transport & decay model envisaged + Flight tests HORIZONTAL Transport & decay model IN TRAIL  LIDAR + Transport & decay model + flight test

  7. Interim Guidance • Needed for A380 proving flights • Based on initial analysis of data • APA, LIDAR • 2 State Letters issued by ICAO • Valid until final guidance issued

  8. Planned Work Program • Final report completed by SG by Q2 2006 • Executive Summary • WG Report • Safety Case Will include - Precise outcome of analysis - Recommended criteria to be applied operationally Sign off by EUROCONTROL, JAA, AIRBUS, FAA and delivered to ICAO

  9. A380 Wake Vortex Project Thank for your attention